Laserfiche WebLink
• Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No.M-88-112 <br /> May 2017 Monthly Report <br /> Page 3 <br /> Table 2—May 2017 Tailing Disposal Area Piezometer Depth to Water <br /> Measurements(continued) <br /> Piezometer Date Depth to Water Total Depth (ft) Volume of <br /> feet Water(ft) <br /> P10 5/31/17 57.55 58.30 0.75 <br /> PH 5/31/17 41.38 41.80 0.42 <br /> P12 5/31/17 41.68 41.71 0.03 <br /> P13 5/31/17 41.00 41.34 0.34 <br /> P 14 5/31/17 41.21 41.24 0.03 <br /> P 15 5/31/17 40.86 41.10 0.24 <br /> Table 3 below provides the calendar year 2017 sludge management for the San Luis site. <br /> Table 3 -Water Treatment Plant Sludge Management Year to Date. <br /> Date Quantity Sludge Management <br /> July 2016 104 tons Sludge transferred from drying pad to tailings <br /> impoundment. <br /> Should you have any questions or comments,please do not hesitate to contact either myself at <br /> (719)379-0798 or Mr.Larry Fiske at(303) 837-5676. <br /> Sincerely, <br /> Ju 'o F. Madrid <br /> Sr. upervisor Legacy Sites Reclamation and Closure <br /> Cc: Larry Fiske <br /> File <br />