Laserfiche WebLink
Battle Mountain Resources Inc. <br /> San Luis Project <br /> CMLRB Permit No. M-88-112 <br /> May 2017 Monthly Report <br /> Page 2 <br /> Table 1-May 2017 Ground Water Monitoring Well and Lysimeter Depth to Water <br /> Measurements <br /> Monitoring Site Date Depth to Water(feet) <br /> M-4R 5/31/17 0 <br /> M-6 5/31/17 Dry <br /> M-7 5/31/17 Dry <br /> M-8 5/31/17 Dry <br /> M-9 5/31/17 141.78 <br /> M-10 5/31/17 24.88 <br /> M-11 R 5/31/17 40.69 <br /> M-12 5/31/17 175.30 <br /> M-13R 5/31/17 126.28 <br /> M-14 5/31/17 131.33 <br /> M-15 5/31/17 90.38 <br /> M-16 5/31/17 21.23 <br /> M-19 5/31/17 23.09 <br /> M-21 5/31/17 17.43 <br /> M-22 5/31/17 15.97 <br /> M-26 5/31/17 15.52 <br /> M-32 5/31/17 47.35 <br /> M-33 5/31/17 56.50 <br /> M-34 5/31/17 22.93 <br /> BF-4 5/31/17 24.91 <br /> BF-6 5/31/17 30.87 <br /> LS-1R 5/31/17 Dry <br /> LS-2R 5/31/17 Dry <br /> LS-3 5/31/17 Dry <br /> LD-1R 5/31/17 Dry <br /> LD-2R 5/31/17 Dry <br /> LD-3 5/31/17 Dry <br /> Table 2—May 2017 Tailing Disposal Area Piezometer Depth to Water <br /> Piezometer Date Depth to Water Total Depth(ft) Volume of <br /> (feet) Water(ft) <br /> P6 5/31/17 Dry 72.46 0.00 <br /> P7 5/31/17 92.28 92.50 0.22 <br /> P8 5/31/17 96.65 97.51 0.86 <br /> P9 5/31/17 71.96 72.30 0.34 <br />