My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-15_PERMIT FILE - C1981008A (26)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2017-05-15_PERMIT FILE - C1981008A (26)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 9:01:35 AM
Creation date
6/2/2017 9:54:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
5/15/2017
Doc Name
Topsoil Handling, Stockpiling and Redistribution
Section_Exhibit Name
Section 2.05.4(2)(d) Topsoil Handling, Stockpiling and Redistribution
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11.1 Topsoil Replacement - 1988 and 1995 Study Areas (East of 27.00 Road) <br />....................................................................................................................... 2.05.4(2)(d)-13 <br />12.0 Topsoil Balance and Replacement on Areas West of 27.00 Road...................2.05.4(2)(d)-14 <br />12.0.1 Prime Farmland Soils Balance, Sequence and Volumetrics ..............2.05.4(2)(d)-14 <br />12.1 Morgan Property...................................................................................2.05.4(2)(d)-14 <br />12.2 North of BB Road/West 27.00 Road .................................................... 2.05.4(2)(d)-17 <br />13.0 Topsoil Preparation Procedures Prior to Seeding ............................................. 2.05.4(2)(d)-19 <br />13.1 Irrigated Cropland Topsoil Preparation Procedures (Prime and Non-prime) <br />..................................................................................................................... 2.05.4(2)(d)-19 <br />13.2 Reclaimed Irrigated Pastureland Topsoil Preparation Procedures........ 2.05.4(2)(d)-21 <br />13.3 Dryland Pasture Seedbed Topsoil Preparation Procedures ................... 2.05.4(2)(d)-22 <br />13.4 Differential Settling Management Plan ................................................2.05.4(2)(d) -23 <br />14.0 Topsoil Suitability Criteria and Testing Plan for Reclaimed Soils ................... 2.05.4(2)(d)-24 <br />15.0 Topsoil Remediation Plans............................................................................... 2.05.4(2)(d)-24 <br />16.0 Literature Cited.................................................................................................2.05.4(2)(d)-26 <br />Tables <br />Table 2.05.4(2)(d)-1 Spoil and Soil Criteria for Areas West of 27.00 Road ..............2.05.4(2)(d)-4 <br />Table 2.05.4(2)(d)-2 Topsoil Stockpile Inventory ......................................................2.05.4(2)(d)-9 <br />Table 2.05.4(2)(d)-3 Topsoil and Subsoil Balance on Morgan Property ................. 2.05.4(2)(d)-16 <br />Table 2.05.4(2)(d)-4 <br />Topsoil Balance North of BB & West of 27.00 Road (WFC -Johnson, -Lloyd, -Benson West) <br />....................................................................................................................... 2.05.4(2)(d)-19 <br />January 2016 (TR -70) <br />
The URL can be used to link to this page
Your browser does not support the video tag.