My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-15_PERMIT FILE - C1981008A (26)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981008
>
2017-05-15_PERMIT FILE - C1981008A (26)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2018 9:01:35 AM
Creation date
6/2/2017 9:54:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008A
IBM Index Class Name
Permit File
Doc Date
5/15/2017
Doc Name
Topsoil Handling, Stockpiling and Redistribution
Section_Exhibit Name
Section 2.05.4(2)(d) Topsoil Handling, Stockpiling and Redistribution
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br />Section 2.05.4(2)(d) <br />Topsoil Handling, Stockpiling and Redistribution <br />1.0 Introduction........................................................................................................... 2.05.4(2)(d)-1 <br />2.0 Overburden and Interburden Characteristics........................................................2.05.4(2)(d)-2 <br />3.0 Acid and Toxic -Forming Materials at New Horizon 2 Mine...............................2.05.4(2)(d)-2 <br />4.0 Redistributed Soil and Spoil Monitoring Program...............................................2.05.4(2)(d)-3 <br />5.0 Unsuitable Spoil Mitigation Plan..........................................................................2.05.4(2)(d)-5 <br />6.0 New Horizon #2 Mine Spoil Compactibility and Erodibility...............................2.05.4(2)(d)-6 <br />7.0 New Horizon 2 Mine Topsoil Management Plan General Considerations ........... 2.05.4(2)(d)-7 <br />8.0 Topsoil Storage..................................................................................................... 2.05.4(2)(d)-7 <br />8.1 Topsoil Storage Prime Farmland............................................................ 2.05.4(2)(d)-10 <br />8.2 Topsoil Storage Non -Prime Farmland Areas ..........................................2.05.4(2)(d)-10 <br />9.0 General Topsoil Handling & Placement Procedures Prior to February 2008 <br />....................................................................................................................... 2.05.4(2)(d)-11 <br />9.1 Morgan Property Soil Augmentation Plan .............................................. 2.05.4(2)(d)-11 <br />10.0 General Topsoil Handling & Placement Procedures After February 2008 ......2.05.4(2)(d)-12 <br />10.1 Mitigation of Friable Rock Deposits ..................................................... 2.05.4(2)(d)-12 <br />10.2 Subsoil and Topsoil Placement Equipment and Practices .................... 2.05.4(2)(d)-13 <br />11.0 Topsoil Replacement........................................................................................2.05.4(2)(d)-13 <br />January 2016 (TR -70) <br />
The URL can be used to link to this page
Your browser does not support the video tag.