Laserfiche WebLink
600 6100 <br /> 12H-IR Injection Well Drilling and Completion Information <br /> 700 6000 <br /> 0.0'-132.8' MD KB; 0.0'-120.0' MD GL: drill 24.0" conductor hole <br /> 0.0'-132.8' MD KB; 0.0'-120.0' MD GL: install 16.0" OD x 15.124" ID conductor casing (J-55, 75.0 lb/ft), cement to surface 800 5900 <br /> 132.8'-1375.0' MD KB; 120.0'-1362.2' MD GL: directional drill 13.50"vertical intermediate hole to KOP Measured <br /> Depth GL <br /> 1375.0'-2275.1' MD KB; 1362.2'-2262.3' MD GL: directional drill 13.50" curve portion intermediate hole, average 10.0° per 100 ft 900 5800 <br /> East 0.0'-2275.1' MD KB; 0.0'-2262.3' MD GL: install 9.625" OD x 8.835" ID intermediate casing (J-55, 40.0 lb/ft), cement to surface West <br /> 1478.8' MD KB; 1466.0' MD GL: install DV tool 5700 <br /> l000 <br /> 0.0'-2275.1' MD KB; 0.0'-2262.3' MD GL: cement intermediate casing, Portland Type I/II <br /> 2275.1'-3521.5' MD KB; 2262.3'-3508.7' MD GL: directional drill 8.5" production hole to intersection of 121-1-1 cavity; maintain drill path V above base of UBB KB:6700.8', est i 5600 <br /> GL:6688.0', est ! I 1100 - <br /> 2062.9'-3521.5' MD KB; 2050.1'-3508.7' MD GL: install 7.0" x 6.366" ID FJ production casing (J-55, 23.0 lb/ft); install hanger at 2050.1 MD GL(DS) <br /> Plug and Abandon Kick-Off Point <br /> 1375.0 MD KB ssoo <br /> 2087.8 MD KB; 2075.0 MD GL: set 7.0"Cast Iron Bridge Plug (CIBP) 1362.2 MD GL <br /> 0.0'-2087.8' MD KB; 0.0'-2075.0' MD GL: cement plug to surface <br /> DV Tool 5400 <br /> -1478.8 MD KB <br /> -1466.0 MD GL <br /> Intermediate Hole Drill Path 5300 <br /> 13.50"dia., 10.0°/100'Build Rate 140 <br /> 132.8-2275.1 MD KB <br /> 120.0-2262.3 MD GL <br /> TD in Lower UBB\ 5200 <br /> �500 <br /> 7.0"Heavy Duty Liner Hanger <br /> -2062.9 MD KB 5100 <br /> Production Hole Drill Path Intermediate Casing --2050.1 MD GL <br /> 8.50"dia.Directional Hole 9.625"OD x 8.835" ID;J-55,40.0 lb/ft Install at DS 1600 <br /> Production Liner 2275.1-3521.5 MD KB 8.679"drift; 10.625"Coupling OD <br /> 7.00"OD x 6.366" ID, J-55, FJ Steel 2262.3-3508.7 MD GL 0-2275.1 MD KB <br /> Maintain Drill Path s000 <br /> 2062.9-3521.5 MD KB, approx. 1'Above Base of UBB 0-2262.3 MD GL o <br /> Intersection with 12H-I (TD) 2050.1-3508.7 MD GL, approx. Land Casing in Lower UBB <br /> 3521.5 MD KB - <br /> 3508.7 MD GL 4900 <br /> �8 <br /> 00 <br /> P&A <br /> Cement Plug to Surface 4800 <br /> �o <br /> Top of OSMB <br /> \71 1 711-1-L-L I I .... . .. . ..... <br /> w w 4, ni o cNo m rn C. wo a000 4700 <br /> O CD p o O O CD O p O O O O N O <br /> o P&A <br /> Cast Iron Bridge Plug(CIBP) <br /> As Built Drill Path 2075.0 MD GL asoo <br /> Elevation,ft <br /> Natural Soda LLC <br /> 12H-IR Well Schematic P&A <br /> Section 26,T1S, R98W Rio Blanco County, CO <br /> Daub&Associates,Inc.,�J►� ��.. <br /> r;-;, Date: April 13,2017 <br />