My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-19_GENERAL DOCUMENTS - M1983194
DRMS
>
Day Forward
>
General Documents
>
Minerals
>
M1983194
>
2017-05-19_GENERAL DOCUMENTS - M1983194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 3:53:02 AM
Creation date
6/1/2017 9:34:52 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
General Documents
Doc Date
5/19/2017
Doc Name
Application to add solution mining injection well 12H-IR to UIC Area Permit
From
Daub & Associates, Inc.
To
DRMS
Email Name
THM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
600 6100 <br /> 12H-IR Injection Well Drilling and Completion Information 700 6000 <br /> 0.0'-132.8' MD KB; 0.0'-120.0' MD GL: drill 24.0"conductor hole <br /> 800 5900 <br /> 0.0'-132.8' MD KB; 0.0'-120.0' MD GL: install 16.0"OD x 15.124" ID conductor casing (J-55, 75.0 lb/ft), cement to surface <br /> Measured <br /> 132.8'-1375.0' MD KB; 120.0'-1362.2' MD GL: directional drill 13.50"vertical intermediate hole to KOP Depth GL <br /> 1375.0'-2275.1' MD KB; 1362.2'-2262.3' MD GL: directional drill 13.50" curve portion intermediate hole, average 10.0° per 100 ft soo 5800 <br /> East 0.0'-2275.1' MD KB; 0.0'-2262.3' MD GL: install 9.625" OD x 8.835" ID intermediate casing (J-55, 40.0 lb/ft), cement to surface West <br /> 1478.8'MD KB; 1466.0' MD GL: install DV tool 1000 5700 <br /> 0.0'-2275.1' MD KB; 0.0'-2262.3' MD GL: cement intermediate casing, Portland Type 1/II <br /> KB: 6700.8',est 2275.1'-3521.5' MD KB; 2262.3'-3508.7' MD GL: directional drill 8.5" production hole to intersection of 121-1-1 cavity; maintain drill path V above base of UBB GL: 6688.0',est 1100 ssoo <br /> 2062.9'-3521.5' MD KB; 2050.1'-3508.7' MD GL: install 7.0" x 6.366" ID FJ production casing (J-55, 23.0 lb/ft); install hanger at 2050.1 MD GL (DS) <br /> Kick-Off Point <br /> 1375.0 MD KB 1200 5500 <br /> 1362.2 MD GL <br /> DV Tool 1300 5400 <br /> --1478.8 MD KB <br /> -1466.0 MD GL <br /> Intermediate Hole Drill Path 5300 <br /> 13.50"dia., 10.0'/100'Build Rate 1400 <br /> 132.8-2275.1 MD KB <br /> 120.0-2262.3 MD GL <br /> TD in Lower UBB 5200 <br /> isoo <br /> 7.0" Heavy Duty Liner Hanger <br /> Production Hole Drill Path -20 <br /> Intermediate Casing -2050.50.1 MD MD GL GL 5100 <br /> 8.50"dia. Directional Hole 9.625"OD x 8.835" ID;J-55,40.0 lb/ft Install at DS 1600 <br /> Production Liner 2275.1-3521.5 MD KB 8.679"drift; 10.625"Coupling OD <br /> 7.00"OD x 6.366"ID, J-55, FJ Steel 2262.3 MD GL 0-2275.1 MD KB <br /> Maintain 7 Maintain Drill Path 5000 <br /> 2062.9-3521.5 MD KB, approx. 1'Above Base of UBB 0-2262.3 MD GL �'°o <br /> Intersection with 12H-1 (TD) 2050.1-3508.7 MD GL, approx. Land Casing in Lower UBB <br /> 3521.5 MD KB _ <br /> 3508.7 MD GL 4900 <br /> °o <br /> �0 4800 <br /> °° Top of OSMB - <br /> 00 - <br /> w (� w NJ ^' o (No 0 v rn a w i 4700 <br /> to <br /> CY, A O O O O O O CDO O CDN O <br /> O O o CDO O O O O O O O O N O <br /> O <br /> O <br /> 4600 <br /> Elevation,ft <br /> Natural Soda LLC <br /> 12H-IR Well Prognosis Schematic <br /> Section 26, T1S, R98W Rio Blanco County, CO <br /> Daub&Associates, <br /> Date: April 13,2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.