My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-25_PERMIT FILE - P2017008
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2017008
>
2017-05-25_PERMIT FILE - P2017008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2020 11:45:48 AM
Creation date
5/26/2017 1:18:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2017008
IBM Index Class Name
PERMIT FILE
Doc Date
5/25/2017
Doc Name
Application
From
Transit Mix Concrete Co.
To
DRMS
Email Name
TC1
WHE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORWEST HRR SAMPLING <br /> MAY 19,2017 <br /> COR PORAT ION <br /> compliance monitoring. Three of the wells/piezometers will monitor groundwater conditions in the <br /> proposed mining area. The sixth well will monitor groundwater conditions in the sedimentary rock east of <br /> the fault. <br /> The proposed monitoring wells will be constructed in accordance with the RULES AND REGULATIONS <br /> FOR WATER WELL CONSTRUCTION, PUMP INSTALLATION, CISTERN INSTALLATION, AND <br /> MONITORING AND OBSERVATION HOLE/WELL CONSTRUCTION 2 CCR 402-2 (Well <br /> Construction Rules).Five(5)of the six(6)wells will be completed with a Continuous Multichannel Tubing <br /> (CMT) Multilevel System, which allows monitoring at multiple depths with a single casing string. <br /> Information on the CMT System are included in Figures 2 and 3. The last borehole is too deep for the CMT <br /> System and will be completed with permanently installed vibrating-wire piezometers (VWPs). The <br /> proposed monitoring well/piezometer construction will include three completion zones designed to monitor <br /> groundwater conditions at shallow,intermediate,and deep zones. The shallow zone will be close to the top <br /> of the groundwater saturated zone(probably coincident with adjacent Turkey Creek level),the intermediate <br /> zone will be approximately 50 ft below groundwater table,and the deep zone will be approximately 100 ft <br /> below groundwater table. Groundwater samples will be collected quarterly from the middle completion <br /> zone of Compliance Well #1 (LTC-GW-1) and #2 (LTC-GW-2). The samples will be analyzed for the <br /> parameter list summarized in Table 2. All other wells and zones will be sampled as needed for the <br /> parameters needed to assess the groundwater conditions. Water level measurements will be collected <br /> monthly from each completion zone using a water level meter. Data from the V WPs will also be collected <br /> monthly. <br />
The URL can be used to link to this page
Your browser does not support the video tag.