Laserfiche WebLink
600 <br /> 402H-R Recovery Well Drilling and Completion Information <br /> 700 <br /> 0.0'-132.8' MD KB; 0.0'-120.0' MD GL: drill 24.0" conductor hole <br /> 0.0'-132.8' MD KB; 0.0'-120.0' MD GL: Option 1: install 16.0" OD x 15.124" ID conductor casing (J-55, 75.0 Ib/ft), cement to surface 800 <br /> 0.0'-132.8' MD KB; 0.0'-120.0' MD GL: Option 2: install 13.375" OD x 12.715" ID conductor casing (J-55, 48.0 Ib/ft), cement to surface <br /> West 132.8'-1449.6' MD KB; 120.0'-1436.8' MD GL: directional drill intermediate hole to KOP, see options below 900 <br /> East <br /> 132.8'-2306.8' MD KB; 120.0'-2294.0' MD GL: Option 1 (16.0" conductor casing): drill 13.5" diameter, intermediate hole, 10.5°/100' build rate <br /> 132.8'-2306.8' MD KB; 120.0'-2294.0' MD GL: Option 2 (13.375" conductor casing): drill 12.25" diameter intermediate hole, 10.5°/100' build rate <br /> 1000 <br /> 0.0'-2306.8' MD KB; 120.0'-2294.0' MD GL: install 9.625" OD x 8.835" ID intermediate casing (J-55, 40.0 Ib/ft), cement to surface <br /> 2306.8'-2403.8' MD KB; 2294.0'-2391.0' MD GL: directional drill 6.75" or 8.5" production hole to 4021-1-1 well pass-by, maintain drill path 2' above base of UBB <br /> 1100 <br /> KB:6712.8',est <br /> GL: 6700.0',est Measured <br /> �20o Depth GL <br /> Kick-Off Point 1300 <br /> 1449.6 MD KB <br /> 1436.8 MD GL <br /> Intermediate Hole (13.375"Conductor Casing) 1400 <br /> 12.25"dia., 10.5°/100' Build Rate <br /> Intermediate Hole (16.0"Conductor Casing) <br /> 13.5"dia., 10.5°/100'Build Rate <br /> 132.8-2306.8 MD KB 1500 <br /> 120.0-2294.0 MD GL <br /> TD in Lower UBB <br /> 1600 <br /> Intermediate Casing <br /> 9.625"OD x 8.835" ID;J-55,40.0 Ib/ft <br /> 8.679"drift; 10.925"Coupling OD 7`100 <br /> 0-2306.8 MD KB <br /> Production Hole 0-2294.0 MD GL <br /> 6.750"dia. or 8.5"dia. Land Casing in Lower UBB <br /> (Injection Well Pass-By) 7600 <br /> 2403.8 MD KB <br /> 2391.0 MD GL <br /> 00 <br /> No Top of OSMB <br /> N� <br /> 00 <br /> O N <br /> O <br /> O <br /> Natural Soda LLC <br /> 402H-R Well Prognosis Schematic <br /> Section 25, T1S, R98W Rio Blanco County, CO <br /> Daub&Associates,Inc.1M_ <br /> i Date: March 23,2017 <br />