Laserfiche WebLink
600 <br /> 4021-1-1 Injection Well Drilling and Completion Information <br /> 700 <br /> 0.0'-132.8' MD KB; 0.0'-120.0' MD GL: drill 24.0"conductor hole <br /> 0.0'-132.8' MD KB; 0.0'-120.0' MD GL: install 13.375"OD x 12.715" ID conductor casing (J-55, 48.0 Ib/ft), cement to surface 800 <br /> 132.8'-1450.6' MD KB; 120.0'-1437.8' MD GL: directional drill 9.50"vertical intermediate hole to KOP <br /> East 1450.6'-2307.8' MD KB; 1437.8'-2295.0' MD GL: directional drill 9.50"curve portion intermediate hole, average 10.0° per 100 ft 900 <br /> West <br /> 0.0'-2307.8' MD KB; 0.0'-2295.0' MD GL: install 7.0" OD x 6.366" ID intermediate casing (J-55, 23.0 lb/ft), Centek centralizers every 80-100 ft <br /> 0.0'-2307.8' MD KB; 0.0'-2295.0' MD GL: cement intermediate casing, Portland Type 1/11 <br /> 1000 <br /> 2307.8'-5505.6' MD KB; 2295.0'-5492.8' MD GL: approximate length; directional drill 6.125" horizontal hole, maintain drill path 1'above base of UBB <br /> Production Casing (using packer) <br /> 0.0'-2084.7' MD KB; 0.0'-2071.9' MD GL: install 4.5" x 4.0" ID production casing (J-55, 11.4 lb/ft); install annular packer at 2071.9 MD GL(DS) 1100 <br /> 2084.7'-5505.6' MD KB; 2071.9',5492.8' MD GL: install 4.5" x 4.0" ID FJ production casing (J-55, 11.4 Ib/ft)to TD KB:6712.8',est <br /> Production Casing (using hanger) GL:6700.0',est 1200 Measured <br /> Depth GL <br /> 2084.7'-5505.6' MD KB; 2071.9'-5492.8' MD GL: install 4.5" x 4.0" ID FJ production casing (J-55, 11.4 lb/ft); install hanger at 2071.9 MD GL (DS) <br /> Kick-Off Point 1300 <br /> 1450.6 MD KB <br /> 1437.8 MD GL <br /> Intermediate Hole Drill Path 1400 <br /> 9.50"dia., 10.5"/100'Build Rate <br /> 132.8-2307.8 MD KB <br /> 120.0-2295.0 MD GL <br /> TD in Lower UBB <br /> Production Casing (using packer) 1500 <br /> 4.5"OD x 4.0" ID,J-55 <br /> 0.0-2084.7 MD KB 7.0"x 4.5"Annular Packer <br /> 0.0-2071.9 MD GL or 7.0"x 4.5" Heavy Duty Casing Hanger <br /> 4.5"OD x 4.0" ID,J-55, FJ Steel Production Hole Drill Path -2084.7 MD KB 1600 <br /> Intermediate Casing -2071.9 MD GL <br /> 2084.7-5505.6 MD KB 6.125"dia. Directional Hole 7.0"OD x 6.366" ID;J-55, 23.0 lb/ft <br /> 2071.9-5492.8 MD GL 2307.8-5505.6 MD KB Install at DS <br /> 2295.0-5492.8 MD GL 6.241" Drfit;7.875"Coupling OD <br /> Production Casing(using hanger) Maintain Drill Path 1'Above Base of UBB 0-2 MD KB <br /> >>oo <br /> TD: 5505.6 MD KB,approx. 4.5"OD x 4.0" ID,J-55, FJ Steel 0-2295.8 95.0 MD GL <br /> TD: 5492.8 MD GL,approx. 2084.7-5505.E MD KB <br /> Land Casing in Lower UBB <br /> �- 2071.9-5492.8 MD GL 7,90 <br /> Projected 402H-R Pass-by <br /> 2464.5 MD KB <br /> 2451.7 MD GL <br /> 00 <br /> �$a Top of OSMB <br /> A j A W W W W W N O O <br /> ItCDW O V O W V Of (n <br /> A N O <br /> O O O O O O O CD O O <br /> O O O O O O O O O O O O O O O <br /> O <br /> Natural Soda LLC <br /> 4021-1-1 Well Prognosis Schematic <br /> Section 25,T1S, R98W Rio Blanco County, CO <br /> Daub&Associates,Inc. <br /> `;��,��; ���..,������'f�1"11='� �\` Date: March 5,2017 <br />