Laserfiche WebLink
6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) <br /> condition: <br /> Road has to be maintained for duration due to perpetual operation of the Leach Well <br /> (separately owned by THF). reclamation of the expanded portion of the roadway if not <br /> needed for future well maintenance will be done by ripping the portion of the roadbed <br /> to be reclaimed, replacement of topsoil to depth found during construction, and <br /> reseeding. placement of pine saplings as found during construction. <br /> 7. List the seed mixture to be used in the re-establishment of vegetation. See the attached <br /> seed mixture calculation to obtain PLS/acre. For assistance with formulating seed <br /> mixtures and rates, contact the local NRCS if on private land, BLM/USFS if on public <br /> land or State Land Board if on state land. <br /> A. Plant name and seeding rate: <br /> Plant Name Seeding Rate (PLS/Acre) <br /> Zone 5 seed mix as previously approved <br /> Form 2—Public File Page 10 of 14 <br />