Laserfiche WebLink
Table D-1 Seed Mix <br /> Common Name Seed Rate(PLS/acre) <br /> Yarrow 0.1 <br /> Groundsel 0.1 <br /> Lupbo 1.0 <br /> Slender wheatgrass 1.4 <br /> Nodding bnot 2.5 <br /> Sheep fescue 0.5 <br /> Hard fescue 0.5 <br /> Red fescue 0.5 <br /> Tufted hairgrass 0.5 <br /> Redtop 0.1 <br /> Blue wi#drye 1.75 <br /> Muttongrass 0.5 <br /> Total 9.45 <br /> Weed free mulch will be crimped into the seeded ground at a rate of 2000 pounds per acre. <br /> 4. Post Mine Water Structures <br /> The sediment pond will be removed during reclamation grading. The collection ditches will be <br /> removed during reclamation as final toposiling and revegetation takes hold. The diversion ditch <br /> will be left in place following reclamation. This will reduce the amount runoff that passes over <br /> the newly reclaimed WRL following reseeding, and thus reduce erosion. <br /> 5. Mine Features <br /> The waste rock landform will be graded and topsoiled at the end of each stage. The end result <br /> will be the pile shown on Map F-1. The entire WRL will be capped with 12 inches of topsoil, <br /> and then be seeded. <br /> Detroit City Mine February 2017 D-2 F i.•w• n<t.:,.k>.<,. ,at <br />