Laserfiche WebLink
May 17, 2017 C-1981-018/Deserado Mine JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 3 of 5 <br /> <br /> PP-2 Pond DP-1 Pond <br /> <br />GENERAL MINE PLAN COMPLIANCE: <br /> <br />Construction continues as permitted under TR70 and MR170 for the D-Seam dewatering system #2. The <br />construction continues with the initial stages of the Phase I portion of the system with ponds 3, 4, and 5 being <br />constructed. The impoundment of Pond #3 was constructed at the time of the inspection. No compliance issues <br />were noted at the time of the inspection. <br />