Laserfiche WebLink
Indirect costs include contract costs of a job superintendent working 60 hours at <br />$58.56/hr. totaling $3,514. Profit, insurance, and bond are 13.07% of direct <br />costs totaling $2,148. The total contract amount is $22,097. Engineering costs <br />of $939 are 4.25% of the contract amount. The reclamation management cost <br />of $1,105 is 5% of the contract amount. <br />Activity <br />$16,435 <br />Units <br />Unit Cost <br />Total <br />Borehole Sealing <br />4 <br />Holes <br />$909.81 <br />/Hole <br />$3,639 <br />Drill Site Reclaim <br />4 <br />Sites <br />$1,160.19 <br />/Site <br />$4,641 <br />Access Road Reclaim <br />6,105 <br />Feet <br />$1.2153 <br />/Ft. <br />$7,419 <br />Reve etation & Failure Seeding <br />4 <br />Sites w/Roads <br />$183.98 <br />/Hole <br />$736 <br />Total Direct Costs <br />$16,435 <br />Direct Costs <br />$16,435 <br />Job Su edntendent 60 hours x $58.56/hour <br />$3,514 <br />13.07% of Direct Costs includes profit, insurance, bond <br />$2,148 <br />Subtotal contract amount <br />$22,097 <br />Engineering 4.25% of contract <br />$939 <br />Reclamation Management 5% of contract <br />$1,105 <br />Total Bond Required <br />$24,141 <br />See Appendix C, Estimate of reclamation costs for additional exploration drilling <br />cost details by hole. <br />