Laserfiche WebLink
cubic yards of material not wanted for road base or for reservoir construction This overburden will be <br /> spread in the Spoils & Stockpile Area <br /> Excavation and gravel processing is planned to continue for 18 months. The erosion and sediment control <br /> measures will be checked periodically and maintained during this period. Construction of the reservoir <br /> embankment and liner is planned to take another 12 months. Revegetation for permanent stabilization of <br /> the site will follow completion of reservoir construction. <br /> Water will be used for dust suppression. It is expected that up to one acre-foot will be needed per year for <br /> this purpose. This water will be obtained by pumping directly from the Huerfano River at the County Road <br /> 560 crossing This water use is permitted pursuant to the Water Court decree in Case No.13CW3062, <br /> District Court, Water Division 2. <br /> Explosives will NOT be used for any of the mining or reclamation operations. <br /> 025 <br />