Laserfiche WebLink
Cost Estimate for Reclamation <br /> Alternative Cost Estimate <br /> The estimated area in the PYRE Pit#1 that would require seeding is 9.9 acres. <br /> There is 14-17"of topsoil at the site. We would attempt to start a cover crop on the entire area. <br /> After the cover crop is established, <br /> the grass will be planted as recommended by the Natural Resource Conservation Service. <br /> The cost units below already include labor and fuel. The cover crop and grass seeding costs were obtained <br /> from the Natural Resource Cosnervation Service and habe been based on Conservation Reserve Program costs. <br /> The other unit costs were obtained from a local contractor who is <br /> equipped to perform reclamation if PVRE were to default on the reclamation plan. <br /> PVRE Pit#1 <br /> Task Volumes Units Unit Cost Item Cost <br /> Backfill and Grade 40.2 Hours $115.00 $4,623.00 <br /> Replace Topsoil/Overburden <br /> Tractor/Speedy Mover 193.8 Hours $75.00 $14,535.00 <br /> Revegetate Site <br /> Cover crop 9.9 Acres $45.00 $445.50 <br /> Grass seeding 9.9 Acres $45.00 $445.50 <br /> Seed 145.23 Lbs. $10.75 $1,561.22 <br /> (9.9 acres x 14.67#PLS/Acre) <br /> Mobilization <br /> Tractor/Speedy Mover 1 Hours $75.00 $75.00 <br /> Dozer 1 Hours $115.00 $115.00 <br /> TOTAL $21,800.22 <br />