My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-16_PERMIT FILE - M2017009 (3)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2017009
>
2017-05-16_PERMIT FILE - M2017009 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2020 10:47:15 PM
Creation date
5/17/2017 8:31:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2017009
IBM Index Class Name
Permit File
Doc Date
5/16/2017
Doc Name
Adequacy Review Response
From
PVRE Pit #1
To
DRMS
Email Name
JLE
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PVRE Pit#1 Calculation Notes <br /> Alternative Cost Estimate <br /> Calclulations are based on work to an estimated 9.9 acres. <br /> Backfilling and grading <br /> 43,560 sq.ft. Area x 9.9 Ac. = 431,244 sq.ft. <br /> 431,244 sq.ft. x 1 ft. (depth) = 431,244 cu.ft. <br /> 431,244 cu.ft. / 27 cu.ft. = 15,972 CY <br /> 9.9 Ac/ x 43,560 sq.ft.Area in Acre = 431,244 sq.ft. <br /> 431,244 sq.ft. <br /> Depth x 1 ft. <br /> 431,244 cu.ft. <br /> 431,244 cu.ft. / 27 cu.ft. = 15,972 CY <br /> + 15,972 CY <br /> Total Cubic Yards to move 31,944 CY <br /> Dozer will move 795 CY/Hour <br /> 31,944 CY / 795 CY/hour = 40.2 Hrs. <br /> Replace Topsoil/Overburden <br /> 1.42 ft. (inches of. topsoil) x 431,244 = 612,366 cu.ft. <br /> 612,366 cu.ft. / 27 cu.ft. = 22,680 CY <br /> Speedy Mover will move 117 CY/Hour <br /> 22,680 CY / 117 CY/Hour = 193.8 Hrs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.