My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-02_PERMIT FILE - C1981012A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2017-05-02_PERMIT FILE - C1981012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 8:42:22 AM
Creation date
5/12/2017 10:26:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
5/2/2017
Section_Exhibit Name
Exhibit 28 Reclamation Bond Calculation
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Job Condition Correction Factor <br />Operator Skill: <br />0.900 <br />Material consistency: <br />0.900 <br />Dozing method: <br />1.000 <br />Visibility: <br />1.000 <br />Job efficiency: <br />0.830 <br />Spoil pile: <br />0.800 <br />Push gradient: 0.903 <br />Altitude: <br />1.000 <br />Material Weight: <br />1.079 <br />Blade type: <br />1.000 <br />Net correction: 0.5240 <br />Adjusted unit 651.44 LCY/hr <br />production: <br />Adjusted fleet 1954.32 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 3 Dozer(s) <br />Unit cost: $0.395/LCY <br />Total job time: 83.38 Hours <br />Total job cost: $64,366 <br />Source <br />(AB.AVG.) <br />AT HB)) <br />(GEN.) <br />(AVG.) <br />(1 SHIFT/DAY) <br />(FND-RF) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />Page 5 of 161 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.