My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-02_PERMIT FILE - C1981012A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2017-05-02_PERMIT FILE - C1981012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 8:42:22 AM
Creation date
5/12/2017 10:26:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
5/2/2017
Section_Exhibit Name
Exhibit 28 Reclamation Bond Calculation
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: <br />Site: New Elk Mine <br />BULLDOZER WORK <br />Backfill and Regrade East Portal Area <br />Permit Action: 2016 Midterm Review <br />PROJECT IDENTIFICATION <br />Task #: 601 State: Colorado <br />Date: 8/2/2016 County: Las Animas <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Page 4 of 161 <br />Permit/Job#: C1981012 <br />Abbreviation: None <br />Filename: CO 12-601 <br />$97.48 <br />Utilization % <br />NA <br />$103.60 <br />100 <br />$10.74 <br />NA <br />$6.60 <br />100 <br />$38.89 <br />NA <br />Total unit Cost/Hour: $257.31 <br />Total Fleet Cost/Hour: $771.93 <br />MATERIAL QUANTITIES <br />Initial Volume: 144,850 <br />Swell factor: 1.125 <br />Loose volume: 162,956 LCY <br />Source of estimated volume: PAP Exhibit 28 <br />Source of estimated swell Operator Estimate <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 100 feet <br />Unadjusted hourly 1,243.2 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push 5% <br />gradient: <br />Average site altitude: <br />Material weight: <br />Weight description: <br />7.500 feet <br />132 lbs/LCY <br />User Provided <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.