Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />0.40 Minutes <br />0.60 Minutes <br />Page 63 of 161 <br />Site Altitude: 7500 feet <br />Seg # <br />Scraper <br />Push Dozer Source <br />Roll. Res <br />Altitude Ad': <br />1.000 <br />1.000 (CAT HB <br />1 <br />Job Efficiency: <br />0.830 <br />0.830 CAT HB <br />0.00 <br />2921 <br />0.30 <br />2 <br />650.00 <br />Net Correction: <br />0.830 <br />0.830 <br />Travel Time: <br />3.08 <br />3 <br />Road Condition: <br />Firm, smooth, rolling, <br />dirt/it. surfaced, watered, maintained 3.0 <br />10.00 <br />1068 <br />Haul Rnute- <br />4 <br />600.00 <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />% <br />Velocity <br />fpm) <br />Travel Time <br />(min) <br />1 <br />500.00 <br />-3.00 <br />3.00 <br />0.00 <br />2921 <br />0.30 <br />2 <br />650.00 <br />2.00 <br />3.00 <br />5.00 <br />2218 <br />3.08 <br />3 <br />2200.00 <br />7.00 <br />3.00 <br />10.00 <br />1068 <br />1.81 <br />4 <br />600.00 <br />8.00 <br />3.00 <br />11.00 <br />1018 <br />0.59 <br />Haul Time: 5.78 minutes <br />Return Rnute- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />% <br />Total Res <br />% <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />600.00 <br />-8.00 <br />3.00 <br />-5.00 <br />2938 <br />0.27 <br />2 <br />2200.00 <br />-7.00 <br />3.00 <br />-4.00 <br />2938 <br />0.80 <br />3 <br />650.00 <br />1 -2.00 <br />3.00 <br />1 1.00 <br />2913 <br />0.22 <br />4 <br />500.00 <br />1 3.00 <br />3.00 <br />1 6.00 <br />2736 <br />0.19 <br />CIRCES Cost Estimating Software <br />Return Time: <br />1.48 <br />minutes <br />Total Scraper team cycle time: <br />8.26 <br />minutes <br />Adjusted for job conditions: <br />113.65 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />227.30 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />227.30 <br />LCY/Hour <br />Unadjusted unit production/hour: <br />136.92 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Total job time: <br />122.41 <br />Hours <br />Unit cost: $4.402 /LCY <br />Total job cost: <br />$122,475 <br />CIRCES Cost Estimating Software <br />