My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-02_PERMIT FILE - C1981012A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2017-05-02_PERMIT FILE - C1981012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 8:42:22 AM
Creation date
5/12/2017 10:26:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
5/2/2017
Section_Exhibit Name
Exhibit 28 Reclamation Bond Calculation
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 62 of 161 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil to RDA <br />Site: New Elk Mine Permit Action: 2016 Midterm Review Permit/Job#: C1981012 <br />I�:ZIa19L��i7�itil�iy[N��T17►1 <br />Task #: 676 State: Colorado Abbreviation: None <br />Date: 8/2/2016 County: Las Animas Filename: C012-676 <br />User: JDM <br />Load Area <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />COSTShift basis: 1 per day <br />%Utilization -machine: <br />Equipment Descri tion <br />-Scraper: <br />Cat 627G <br />Cat D9T - 9SU <br />-Dozer: <br />Support Equipment -Load Area: <br />NA <br />NA <br />-Dump Area: <br />Road Maintenance -Motor Grader: <br />CAT 14M <br />-Water Truck: <br />Water Tanker, 5,000 Gal. <br />C'nst Rreakdown: Scraner Work Team Sunnort F.ouinment Maintenance F.auinment <br />Total work team cost/hour: $1,000.50 <br />MATERIAL QUANTITIES <br />Initial volume: 27,824 CCY Swell factor: 1.000 <br />Loose volume: 27,824 LCY <br />Source of estimated volume: Map 1 l sheet 3; Permit page 2.05-38 <br />Source of estimated swell factor: Operator Estimate <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight: 2,055 lbs/LCY Struck Volume: 15.70 LCY <br />Material description: User Provided Heaped Volume: 22.00 LCY <br />Rated Payload: 52,800 pounds Average Volume: 18.85 LCY <br />Payload Capacity: 25.69 LCY Adjusted Capacity: 18.85 LCY <br />CIRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />NA <br />NA <br />50 <br />50 <br />Ownership cost/hour: <br />$100.40 <br />$97.48 <br />NA <br />NA <br />$53.53 <br />$26.43 <br />Operating cost/hour: <br />$143.28 <br />$103.60 <br />NA <br />NA <br />$28.36 <br />$20.38 <br />%Utilization -ripper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />$10.74 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$34.24 <br />$38.89 <br />NA <br />NA <br />$35.83 <br />$29.42 <br />Unit Subtotals: <br />$277.92 <br />$250.71 <br />NA <br />NA <br />$117.72 <br />$76.23 <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$806.55 <br />Support: <br />$0.00 <br />Maint: <br />$193.95 <br />Total work team cost/hour: $1,000.50 <br />MATERIAL QUANTITIES <br />Initial volume: 27,824 CCY Swell factor: 1.000 <br />Loose volume: 27,824 LCY <br />Source of estimated volume: Map 1 l sheet 3; Permit page 2.05-38 <br />Source of estimated swell factor: Operator Estimate <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />Material weight: 2,055 lbs/LCY Struck Volume: 15.70 LCY <br />Material description: User Provided Heaped Volume: 22.00 LCY <br />Rated Payload: 52,800 pounds Average Volume: 18.85 LCY <br />Payload Capacity: 25.69 LCY Adjusted Capacity: 18.85 LCY <br />CIRCES Cost Estimating Software <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.