Laserfiche WebLink
Page 130 of 161 <br />Operator Skill: <br />0.900 <br />(AB.AVG.) <br />Material consistency: <br />0.800 <br />(CAT HB) <br />Dozing method: <br />1.000 <br />GEN. <br />Visibility: <br />1.000 <br />(AVG.) <br />Job efficiency: <br />0.830 <br />(1 SHIFT/DAY) <br />Spoil pile: <br />0.800 <br />(FND-RF) <br />Push gradient: <br />1.000 <br />(CAT HB) <br />Altitude: <br />1.000 <br />(CAT HB) <br />Material Weight: <br />1.079 <br />(CAT HB) <br />Blade type: <br />1.000 <br />(PAT) <br />Net correction: 0.5158 <br />Adjusted unit 641.24 LCY/hr <br />production: <br />Adjusted fleet 1923.72 LCY/hr <br />production: <br />JOB TIME AND COST <br />Fleet size: 3 Dozer(s) <br />Unit cost: $0.401/LCY <br />Total job time: 8.49 Hours <br />Total job cost: $6,555 <br />CIRCES Cost Estimating Software <br />