Laserfiche WebLink
Task description: <br />Site: New Elk Mine <br />BULLDOZER WORK <br />Rip and Regrade C&W Train Shop Area <br />Permit Action: 2016 Midterm Review Permit/Job#: C1981012 <br />PROJECT IDENTIFICATION <br />Task #: 751 State: Colorado <br />Date: 8/2/2016 County: Las Animas <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/Hour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: $257.31 <br />Total Fleet Cost/Hour: $771.93 <br />Abbreviation: None <br />Filename: C012-751 <br />$97.48 <br />Utilization % <br />NA <br />$103.60 <br />100 <br />$10.74 <br />NA <br />$6.60 <br />100 <br />$38.89 <br />NA <br />MATERIAL QUANTITIES <br />Initial Volume: 14,520 <br />Swell factor: 1.125 <br />Loose volume: 16,335 LCY <br />Source of estimated volume: Map 11, Map 15 <br />Source of estimated swell Operator Estimate <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />100 feet <br />1,243.2 LCY/hr <br />Materials consistency description: Dry, non -cohesive 0.8 <br />Average push <br />gradient: <br />Average site altitude: <br />Material weight: <br />0% <br />7,500 feet <br />2.132 lbs/LCY <br />Weight description: User Provided <br />Job Condition Correction Factor Source <br />