Laserfiche WebLink
Page 114 of 161 <br />TRUCK/LOADER TEAM WORK <br />Task description: Clean Ponds 004, 007, and 008 Twice During Liability Period <br />Site: New Elk Mine Permit Action: 2016 Midterm Review Permit/Job#: C1981012 <br />PROJECT IDENTIFICATION <br />Task #: 706 State: Colorado <br />Date: 8/2/2016 County: Las Animas <br />User: JDM <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: Generic 8-10 c , 6x4 <br />-Loader: Cat 336D L 10'-6" Stick <br />Support Equipment -Load Area: NA <br />-Dump Area: Cat D9T - 9SU <br />Road Maintenance -Motor Grader: CAT 14M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />Abbreviation: None <br />Filename: CO 12-706 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Sunnort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $735.39 <br />MATERIAL QUANTITIES <br />Initial volume: 19,095 CCY Swell factor: 1.000 <br />Loose volume: 19,095 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />75 <br />NA <br />100 <br />50 <br />50 <br />Ownership cost/hour: <br />$14.02 <br />$47.78 <br />NA <br />$97.48 <br />$53.53 <br />$26.43 <br />Operating cost/hour: <br />$42.53 <br />$48.68 <br />NA <br />$103.60 <br />$28.36 <br />$20.38 <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$0.00 <br />$35.36 <br />NA <br />$38.89 <br />$35.83 <br />$29.42 <br />Unit Subtotals: <br />$56.55 <br />$131.82 <br />NA <br />$239.97 <br />$117.72 <br />$76.23 <br />Number of Units: <br />3 <br />1 <br />0 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$301.47 <br />Support: <br />$239.97 <br />Maint: <br />$193.95 <br />Total work team cost/hour: $735.39 <br />MATERIAL QUANTITIES <br />Initial volume: 19,095 CCY Swell factor: 1.000 <br />Loose volume: 19,095 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />CIRCES Cost Estimating Software <br />