Laserfiche WebLink
Page 113 of 161 <br />-marker <br />Borehole <br />NA <br />NA <br />8.00 <br />EA <br />$3.47 <br />$27.76 <br />location/identification <br />marker (EA, material <br />cost only) <br />-cut casing <br />Exposed casing <br />9" <br />72 <br />8.00 <br />LF <br />$1.76 <br />$14.08 <br />removal - Calculate <br />Circumference in <br />Linear Feet <br />-rig and labor <br />Atlas Capco <br />NA <br />NA <br />45.00 <br />EA <br />$243.17 <br />$10,942.65 <br />DM45/HP - 9.0" <br />-water tanker <br />Water Tanker, 2,500 <br />NA <br />NA <br />45.00 <br />EA <br />$56.19 <br />$2,528.55 <br />Gal. <br />Job Hours: 73.00 Total Cost: $75,207.00 <br />CIRCES Cost Estimating Software <br />