Laserfiche WebLink
17)(Optional) Please provide additional information about the Mine Plan: <br /> Strips will be cut an the 9.9 acre peffinitted area, with a maximurn of 1.5 acre cIffisturbed d <br /> Material will be excavated and stockpiled in previous disturbed area adjacent o cuts and run through <br /> portable wash-plant. Topsoil, will be stockpiled at the western end ot each cut. Tailings trorn <br /> washplant will then be moved back to the mined cut. Mining will commence in a direction from North <br /> to South, filling the cut with tailings and moving on. Upon completion disturbed area will be graded <br /> and restored to previous contours. An excavator and front loader will be used for the excavation and <br /> processing Hired excavator contractor will bp used for grading pining will commence after May 1 <br /> and -nri befnre nrtnbpr 31 earh year The affected lanris are to he us-ri less than nne hunrired eighty <br /> days p a year. <br /> 'nclu6-ig the following. <br /> (1)(b) Topsoil not immediately reclaimed to be covered w. erosion control blankets <br /> Deposit averages 72 in depth <br /> e No permanent structures on site. Shipping containers will be used to house supplies, including <br /> workshop to maintain equipment and gold recovery. Mobile office and R-will be placed on previously <br /> disturbed ground. <br /> (f) Stripped ground will not exceed 75' in width and 600' in length Stockpiled ore material will not <br /> exceed a 1 00'YJ 00'footprint and tailings Will alcp not exceed a 150'xl(IQ'fp rint nngoing <br /> after runAing of the material through the washlnla--nt PLCIS; Will IIA <br /> P'aeed at existing dam feature. Pond dimension (tfiangulff) 6G'xI00'xI20' with a depth of 8' (150,000 <br /> gdums). Pond Will licit USt2 d linel, washing,of the material LftldtU�, d Ntdl to 1 iold t!IU Wd tt�l. <br /> e mine will be accessed via an existing spur off of Moffat •un y Road 86. 1 he spur is <br /> approximately in length an in width. No improvements tot e this spur will be necessary.The <br /> spur accesses a previously worked pit. <br /> (h)The West Side Placer will use approximately 12 acre feet of water per annum. Only one pond will <br /> be open at a time.The north pond will be created first to cover the north section of mining Once <br /> mining the north section will be complete, the north pond's water will be pumped over to create the <br /> sn�_uth�nnnd anri than north pond Will be reclaimed <br /> (j) No *njUFY to existing water rights, area is not apffOpriated. All water taken from the well will be <br /> placed FuCIc k into the a a t' <br /> i. <br /> (k) Ail fuel and other hydrocarbons will be stored in secondary containment dt dil EI11Wb. <br /> Additional ec ama ion Fees <br /> P ugin of we -$3,739.00 <br /> Seedmix- ($120 per acre x5) - $600 <br /> Till and Seeding($300 per acre x5) $1500 <br /> Demolition of Pond -51500 <br /> ----------------------------------------------------------- <br /> 7C�79U ��T9022 <br /> revious reclamation costs : <br /> Total reclamation estimate: 14,6ZI.7Z <br />