Laserfiche WebLink
April 19, 2017 C-1981-022/Elk Creek Mine LDS <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 3 of 8 <br /> <br />(6)/4.03.2(5) and (6); Reclamation 4.03.1(7)/4.03.2(7): <br /> Roads around the main facilities area were in good shape. The road up Bear Creek was in good condition <br />as far as the vent shaft (it was not inspected beyond that point). The county road up Hubbard Creek was in poor <br />condition, but passable. <br /> <br />SUPPORT FACILITIES - Rule 4.04: <br /> The new Vessels thermal oxidizer facility had been constructed at the site of the old Bear Creek vent shaft. <br />The thermal oxidizer was burning methane, but was not yet operating perfectly. <br /> <br />DOCUMENTS RECEIVED <br />N/A <br />OTHER (SPECIFY) <br />N/A <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br /> <br />PHOTOGRAPHS <br /> <br /> <br />Figure 1: Pond B <br /> <br /> <br /> <br />