My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-03_INSPECTION - C1996083
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996083
>
2017-05-03_INSPECTION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2017 10:07:47 AM
Creation date
5/3/2017 1:25:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Inspection
Doc Date
5/3/2017
Doc Name
Inspection Report
From
DRMS
To
Bowie Resources, LLC
Inspection Date
4/26/2017
Email Name
CCW
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 26, 2017 C-1996-083/Bowie No. 2 Mine CCW <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 10 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 4 of 8 <br /> <br />of the gob pile. <br /> <br />ROADS – Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3) <br />Drainage 4.03.1(4)/4.03.2(4) <br />Surfacing and Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) <br />Reclamation 4.03.1(7)/4.03.2(7): <br /> The haul road consists of two portions: (1) a paved portion connecting the portal benches to the wash plant <br />and storage facilities/stockpile area, (2) a dirt portion connecting the wash plant to Gob Pile #2. The haul road is <br />well maintained and in good condition. The ditches were in the process of being cleaned. There were no erosional <br />issues. The access road to Pond J and the loadout was in good repair. There were no low s pots or ruts. <br /> <br />SLIDES and DAMAGE - Rule 4.12: <br /> Please see the Processing Waste/Coal Mine Waste Piles section of this report for more details on the s lide <br />at the #2 and #4 Gob Piles. <br /> <br />SUPPORT FACILITIES - Rule 4.04: <br /> - The wash plant was inactive during the inspection. The last of the coal had been cleaned and sent to the <br />stockpile pad. The last shipment of coal was scheduled to be shipped on April 27, 2017. <br /> <br />Other facilities inspected include the loadout, the D Portal Bench and the Utility Bench. There were no off site <br />impacts. Runoff was conveyed properly to the corresponding ditches . <br /> <br /> <br />DOCUMENTS RECEIVED: None <br />OTHER (SPECIFY): None <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.