My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-01_INSPECTION - M1982112
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1982112
>
2017-05-01_INSPECTION - M1982112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 6:18:09 PM
Creation date
5/2/2017 10:01:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982112
IBM Index Class Name
INSPECTION
Doc Date
5/1/2017
Doc Name
Inspection Report
From
Holland & Hart
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a. Pursuant to the Mined Land Recla7ation Fernit <br /> and the Limitations expressed in the Application <br /> herein, no more than one acre <br /> of pond shall h= cpened (one arse of exposed <br /> ground water) at any tine for (lining operations, wash <br /> water and settling pond for wash water. Net <br /> annual evaporation fron exposed ground water is <br /> estimated to be 2.33 feet per year (presu:r^d ice- <br /> free), distributed as follows: <br /> January -- 0.07 acre-feel <br /> February - 0.08 acre-feet <br /> March - 0.10 acre fc;t <br /> Ppril - 0.16 acre -feet <br /> May - 0.21 acre-feet <br /> June - C.31 acre-feet <br /> July - 0.37 acre-feet <br /> August - 0.35 acre;-feet <br /> September - 0.28 acrc-feet <br /> October 0.19 acre-feet <br /> Nove�bec - 0.13 acre-feet <br /> Decer-ber - 0.08 acre-feet <br /> Y,. Faxizum annual production of mined sand and <br /> gravel is planned to be 100,000 tons which will <br /> -asuiL in reieutivu ,,L .i.00 a:cxv-,eeL annually or :)'t or <br /> sand and gravel nixed and sold. <br /> e. . Dust control is intended tv consume 0.3 acre- <br /> fcct per, year. <br /> d. Strean an3 transportation losses are expected <br /> to be 2.8% of Wastewater discharged by the <br /> Elizabeth wastewater treatment plant to the point <br /> of replacer.ent. <br /> e. the ar.ount of water decreed by the Court for <br /> replacement as result of operations of the Hiller <br /> Pit shall be 15 acre-feet per year. At such time <br /> as the Miller Pit operations shall cease, the 15 <br /> acre-feet decreed for its operation can be used <br /> for the purposes described in this Decree for Hunc <br /> Well No. 1. <br /> 17. Aug7enta ion WatPL_sn,urce5: <br /> The source of the water to be used by tie Applicant is <br /> obtained by Applicant pursuant to a fifteen year contract <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.