My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-05-01_INSPECTION - M1982112
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1982112
>
2017-05-01_INSPECTION - M1982112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2020 6:18:09 PM
Creation date
5/2/2017 10:01:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982112
IBM Index Class Name
INSPECTION
Doc Date
5/1/2017
Doc Name
Inspection Report
From
Holland & Hart
To
DRMS
Email Name
PSH
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wells described herein, zhe State Engineer shall consider <br /> the rights granted herein as valid. If Applicant fails to <br /> construct the well for which the pernit was issued within <br /> the period of tine authorized by statute, including legally <br /> authorized extensions of any such tine period, then, when <br /> Applicant is ready tn drill the well, applicant shall file a <br /> second application for such well and the State Engineer <br /> shall issue a pernit with restrictions no more ,urdenso=e <br /> than are found in this Decree, pursuant, as well to C.R.S. <br /> 37-90-1�47(2) . <br /> rMlsi_KO-2 PART I: PI.ail_£Q$ ayQ+l1+NTATIOtLF9$_i$8 t47 L8R ?I� <br /> 12. Nar_s,sfshP__ApFlas.,tU: <br /> Rick Lee Hunt <br /> 43160 County Road 17-21 <br /> Elizabeth, CO 80107 <br /> 13. Irs1'� LSSLusu�e_is b��u3T£tzt = <br /> The structure to be aug-ented for the Miller Pit <br /> eperation under Well Pernit No. 35808-F, issued October 12, <br /> 1989, will be an open gravel mining pit according to the <br /> 1 termvs and conditions of the Mined Lard Reclamation Permit <br /> hu7bered M-82-112, Revision TP.-17 . Miller Pit will be a <br /> portable excavation within the 80 acres described herein and <br /> at no tine will pore than one acre of ground water Le <br /> exposed: At current mining rates, it is anticipated that <br /> dining operations will be completed within the next five <br /> years. <br /> 14. 11 r. DescZ pticn of Water Rights Use.1 for A�o-.entaticn: <br /> The source of the water to be used by the Applicant is <br /> described in Paragraph 9.2. herein. <br /> 15. Purpose Aug-6-_ntaticn: <br /> Replacement of out-of-priority depletions resultin; <br /> f ron the operation of the Miller Pit. <br /> 16. kii1jer .Fit WateZ R��sire PntfDc Fl inns; <br /> The water replace-ent requirement of the *Biller Pit <br /> operation is expected to not exceed 15 acre-feet per year <br /> based on the following criteria: <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.