Laserfiche WebLink
depletions resulting from the ooeration of the Miller Pit. <br /> The crater requirement of the Miller Pit operation is <br /> expected to riot excecJ 15 acre-feet per year based on the <br /> following criteria: <br /> a. Pursuant to the Mir.nd Land Reclamation <br /> Permit and the limitations expressed in the <br /> Application herein, no yore that one acre of <br /> pond shall b� opened tone acre of expc,sed <br /> ground water) at any tire for mining <br /> operations, for wash water and settling pond <br /> for wash water. Net annual evaporation from <br /> ^xposed ground water is estirrated to be 2.33 <br /> acre feet per year (presurned ice-free), <br /> distributed as follows: <br /> ,january - 0.07 Acre-feet <br /> Februery - 0.08 Acre feet <br /> March - 0.10 Acre-feet <br /> April - 0.16 Af;re-rcet <br /> May - 0.21 Acre-feet <br /> June - 0.31 Acre-feet <br /> July - 0.3') Acre-feet <br /> August - 0.35 Acre-feet <br /> September - 0.28 Acre-feet <br /> ectober - O.i9 Acre-teer, <br /> Yr veTi,er 0.13 Acre-foot <br /> Dece,-±,er - 0.08 bore-feet <br /> There will be no evaporation during periods when <br /> the pond is iced over. <br /> b. ivu�uai productlen of aggregate is planned to <br /> be 100,000 tons which will result in retention of <br /> 3.86 acre-feet annually or 5% of aggregate rnined <br /> and sold. <br /> C. irrst control is intended to consure 0.3 acre- <br /> feet per year. <br /> d. Stream and transportation losses are expected <br /> to be 2.8%. <br /> C C"iW Hte�� Paz t I: 1►__u�ntatiQn_Qf._AUZ;Qultuxal <br /> Irrigatio : <br /> 1. game of Structure - The well will be callel hurt <br /> Well No. 1. <br /> S <br />