Laserfiche WebLink
Table 3 <br /> LAGGED DEPLETIONS AND PROPOSED REPLACEMENTS <br /> Fremont Paving S Redi-Mix-Pueblo East Pit <br /> 2017 Plan Year <br /> (1) (2) (3) (4) (5) <br /> Plan Year Net Total Total Lagged <br /> 2017 Evaporative Operational Losses Stream AGUA <br /> Month Losses Losses from Depletions Replacement <br /> Evans#2 Pit Credits <br /> (acre-feet) (acre-feet) (acre-feet) (acre-feet) (acre-feet) <br /> April,2017 1.85 0.77 2.61 1.99 2.15 <br /> May 2.57 0.77 3.34 2.42 2.60 <br /> June 3.11 0.77 3.88 2.84 3.00 <br /> July 2.98 0.77 3.75 3.10 3.20 <br /> August 2.97 0.77 3.73 3.22 3.35 <br /> September 2.24 0.77 3.01 3.13 3.20 <br /> October 1.63 0.77 2.40 2.86 2.95 <br /> November 0.88 0.77 1.64 2.49 2.55 <br /> December 0.62 0.77 1.39 2.16 2.20 <br /> January,2018 0.65 0.77 1.42 1.97 2.00 <br /> February 0.64 0.77 1.40 1.87 1.90 <br /> March 0.88 0.77 1.65 1.85 1.90 <br /> Total 21.03 9.20 30.23 29.91 31.00 <br /> Notes: <br /> (1) Equals Column(7),Table 1. <br /> (2) Equals Column(4),Table 2. <br /> (3) Equals Columns(1)plus(2). <br /> (4) Based on Glover Calculations(T=100,000;s=0.2;X=1710;W=5460). <br /> (5) Fully consumable credits from AGUA <br /> Deere&Ault Consultants,Inc. 12/29/2016 QA0183 Fremont Paving&Red-Mix1017 Pueblo East Pit 2017 SWSP12017 Pueblo East Pit SWSP Tahles.xlsx <br />