Laserfiche WebLink
Table 2 <br /> OPERATIONAL LOSSES <br /> Fremont Paving&Redi-Mix-Pueblo East Pit <br /> 2017 Plan Year <br /> (1) (2) (3) (4) <br /> Plan Year Amount of Water Lost Water Used Total <br /> 2017 Aggregate With Mined for Dust Operational <br /> Month Production Aggregate Control Losses <br /> (tons) (acre-feet) (acre-feet) (acre-feet) <br /> April,2017 16,667 0.49 0.28 0.77 <br /> May 16,667 0.49 0.28 0.77 <br /> June 16,667 0.49 0.28 0.77 <br /> July 16,667 0.49 0.28 0.77 <br /> August 16,667 0.49 0.28 0.77 <br /> September 16,667 0.49 0.28 0.77 <br /> October 16,667 0.49 0.28 0.77 <br /> November 16,667 0.49 0.28 0.77 <br /> December 16,667 0.49 0.28 0.77 <br /> January,2018 16,667 0.49 0.28 0.77 <br /> February 16,667 0.49 0.28 0.77 <br /> March 16,667 0.49 0.28 0.77 <br /> Total 200,000 5.89 3.31 9.20 <br /> Notes: <br /> (1)Projected mining provided by Fremont Paving&Redi-Mix. <br /> (2)Column(2)times 2000 times 4%divided by 62.4 divided by 43,560 <br /> (3) Based on 1,080,000 gallons per year as provided by Fremont Paving&Redi-Mix <br /> (4)Equals the sum of Columns(2)and(3). <br /> Deere&Ault Consultants,Inc. 12/29/2016 Q:W183 Fremont Paving&Red-Mix%017 Pueblo East Pit 2017 SWSP12017 Pueblo East Pit SWSP Tablesidu <br />