Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Backfill and Grade Sandstone Sub Thickener Underflow Pipeline <br />Site: Foidel Creek Mine Permit Action: TR87 Permit/Job#: C1982056 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 4/24/2017 County: Routt <br />User: TNL <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C056-000 <br />INDIRECT COSTS <br />$1.23 <br />Form <br />Fleet <br />Task <br />2.02 <br />Task <br />Description <br />Used <br />Size <br />Hours <br />Cost <br />001 <br />Backfill and Grade Pipeline 75' open trench <br />DOZER <br />1 <br />0.37 <br />$30.00 <br />Sandstone Sub <br />TOTAL INDIRECT COST = <br />$160.28 <br />002 <br />Reveg of Pipeline Sandstone Sub (Buried from <br />REVEGE <br />1 <br />3.80 <br />$31.00 <br />MR 306 <br />SUBTOTALS: <br />4.17 <br />$61 <br />INDIRECT COSTS <br />$1.23 <br />OVERHEAD AND PROFIT: <br />$0.64 <br />Liability insurance: <br />2.02 <br />Performance bond: <br />1.05 <br />Job superintendent: <br />2.09 <br />Profit: <br />10.00 <br />Total = <br />$1.23 <br />Total = <br />$0.64 <br />Total = <br />$152.31 <br />Total = <br />$6.10 <br />TOTAL O & P = <br />$160.28 <br />CONTRACT AMOUNT (direct + O & P) = <br />$221.28 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />0.00 <br />Total = <br />0.00 <br />Engineering work and/or contract/bid preparation: <br />0.00 <br />Total = <br />$0.00 <br />Reclamation management and/or administration: <br />0.00 <br />$0.00 <br />CONTINGENCY: <br />0.00 <br />Total = <br />$0.00 <br />TOTAL INDIRECT COST = <br />$160.28 <br />TOTAL BOND AMOUNT (direct + indirect) = $221.28 <br />