My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-21_INSPECTION - C1982056
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1982056
>
2017-04-21_INSPECTION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2017 7:18:38 AM
Creation date
4/24/2017 6:25:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Inspection
Doc Date
4/21/2017
Doc Name
Inspection Report
From
DRMS
To
Twentymile Coal, Inc
Inspection Date
3/29/2017
Email Name
TNL
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 29, 2017 C-1982-056/Foidel Creek Mine TNL <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 3 of 15 <br /> <br /> <br />Location holding <br />water Discharge maintenance notes <br />6MN Reservoir Y N NW diversion ditch is clear and functional <br /> <br />6MN ventilation <br />shaft site sed <br />pond <br />Y N <br />Fish Creek <br />Tipple pond Y Y <br />Culvert SW of tipple <br />ponds 1/2 full, needs <br />maintenance <br />diversion ditch along the N side clear and <br />functional <br />Fish Creek <br />Borehole Y Y <br />3 cell pond. Pumps turned on approx.. 24 <br />hrs before inspection, discharge at site <br />115 triggers sampling at Fish Creek <br />downstream. <br />18L vent shaft <br />ponds Y N <br />Pond F Y N <br />Flume needs repair. <br />Cattails around primary <br />spillway should be cut <br />back <br /> <br />Pond G Y N <br />Pond E Y Y delta at inlet has been cleaned out <br />Area No. 1 Pond <br />(Pit Pond) Y Y <br />Pond D Y Y <br />Pond B Y Y <br />Remove metal rails <br />sliding into 3rd pond <br />cell. Delta needs to be <br />cleaned out. <br />3 cell pond. TC acknowledged need to <br />clean out Delta and BOB pile slump once <br />conditions allow access to clean out point <br />allow <br />Pond C Y N <br />veg at eastern end of the embankment <br />looks sparse. TC indicated that it was <br />inter-seeded by hand last fall <br />Pond T Y N <br />At the primary spillway <br />culvert, cattails should <br />be cut back <br />v-notch weir <br />Water <br />Treatment <br />ponds <br />Y Y aerator was down at time of inspection <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.