Laserfiche WebLink
March 29, 2017 C-1982-056/Foidel Creek Mine TNL <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 3 of 15 <br /> <br /> <br />Location holding <br />water Discharge maintenance notes <br />6MN Reservoir Y N NW diversion ditch is clear and functional <br /> <br />6MN ventilation <br />shaft site sed <br />pond <br />Y N <br />Fish Creek <br />Tipple pond Y Y <br />Culvert SW of tipple <br />ponds 1/2 full, needs <br />maintenance <br />diversion ditch along the N side clear and <br />functional <br />Fish Creek <br />Borehole Y Y <br />3 cell pond. Pumps turned on approx.. 24 <br />hrs before inspection, discharge at site <br />115 triggers sampling at Fish Creek <br />downstream. <br />18L vent shaft <br />ponds Y N <br />Pond F Y N <br />Flume needs repair. <br />Cattails around primary <br />spillway should be cut <br />back <br /> <br />Pond G Y N <br />Pond E Y Y delta at inlet has been cleaned out <br />Area No. 1 Pond <br />(Pit Pond) Y Y <br />Pond D Y Y <br />Pond B Y Y <br />Remove metal rails <br />sliding into 3rd pond <br />cell. Delta needs to be <br />cleaned out. <br />3 cell pond. TC acknowledged need to <br />clean out Delta and BOB pile slump once <br />conditions allow access to clean out point <br />allow <br />Pond C Y N <br />veg at eastern end of the embankment <br />looks sparse. TC indicated that it was <br />inter-seeded by hand last fall <br />Pond T Y N <br />At the primary spillway <br />culvert, cattails should <br />be cut back <br />v-notch weir <br />Water <br />Treatment <br />ponds <br />Y Y aerator was down at time of inspection <br /> <br />