My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-21_REVISION - M2016081
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2016081
>
2017-04-21_REVISION - M2016081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:02:12 PM
Creation date
4/22/2017 10:35:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016081
IBM Index Class Name
Revision
Doc Date
4/21/2017
Doc Name
Completeness Response and Adequacy CN-1
From
AuPt Industries
To
DRMS
Type & Sequence
CN1
Email Name
ACY
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT D - Reclamation Plan <br />Rule 6.3.4 (Starts on Page 139 of the Rules) <br />The purpose of the Reclamation Plan is to describe the timing, procedures, criteria and materials that will be <br />used to reclaim the affected land to the proposed post -mining land use. Reclamation is required for all affected <br />lands. This plan must be correlated to Exhibit E - Map. <br />1) Primary future (Post -mining) land use (check one): <br />-a Cropland (CR) Ja Pastureland (PL) General Agriculture (GA) <br />Rangeland (RL) Forestry (FR) Wildlife Habitat (WL) <br />Residential (RS) Recreation (RC) Industrial/Commercial (IC) <br />2) Please provide a general description of how the mined area will be Reclaimed: <br />Processed gravels will be placed into back into excavated cuts. Stockpiled topsoil will be spread ontop <br />of the reclaimed processed material. Grading will then take place to existing contours and then will be <br />cPPrlPrf with native grasses_ The mineahle lana Sits nn an alluvial nlanP - nParlyPn _rfPr_tly flat_ <br />3) What will the final grade of the reclaimed slopes (Horizontal: Vertical): 3 H: 1 V <br />(Note: If the Applicant proposes slopes steeper than 3H: 1 V (example 1 H: I V, 2H: 1 V, etc.), please <br />include a justification: <br />Any slopes will be reclaimed to a 311 ratio. <br />a. Please provide a general description of the backfilling and grading: <br />Stockpiled top*oil will be spread ontop of the reclaimed processed gravels. Grading will then -take <br />plare to existing rnntrnirs Grading will hp ntitsmimrPrl with Inral rnPtr;'LtorS. <br />4) De th of topsoil to be salvaged (only for surface disturbances) (check one): <br />4-6 inches 6-8 inches <br />✓ 8-10 inches 10-12 inches <br />Other: _ <br />NIA, explain: <br />
The URL can be used to link to this page
Your browser does not support the video tag.