My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-21_REVISION - M2016081
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2016081
>
2017-04-21_REVISION - M2016081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:02:12 PM
Creation date
4/22/2017 10:35:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2016081
IBM Index Class Name
Revision
Doc Date
4/21/2017
Doc Name
Completeness Response and Adequacy CN-1
From
AuPt Industries
To
DRMS
Type & Sequence
CN1
Email Name
ACY
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17) (Optional) Please provide additional information about the Mine Plan: <br />Strips will be eut em the 9.9 aere per-mitted area, with a maximum of 1.5 aere distufbed during rni <br />P Idbt:b VVILII 0 111GAIIIIane distuibcIIII-C of 2.5 dL[t!b including. - eds, ponds, toads, etc. <br />Material! will be excava9d and st6CkPlI9d Irl plT - - Jed area adjacent. Lo curs and run ithroagtr <br />portable wash -plant. Topsoil, will e stockpiled at the western end of each cut. Tailings from <br />washplant will then be moved back to the mined cut. Mining will commence in a irection from North <br />to South, filling cuts with tailings and moving on. Upon completion disturbed area will be graded and <br />restored to previous contours. An excavator and front loader will be used for the excavation and <br />processinHired excavator contractor will he used for grading. Mining wi11 commence after May I <br />da,� ea�— <br />(1)(b) TUpsull nut lFrunedidWly recialmed to be covered w. eruslan contrul bidnketb <br />Deposit averages 720 in depth <br />e o permanent structures on site. SKipping containers will be used to &use supp des, including <br />workshop to maintain equipment and gold recovery. Mobile office and RV will be placed on previously <br />disturbed around. <br />(f)Stripped ground will not exceed 75' in width and 600'jn-lenp-th-Stockpiled ore material will not <br />exceed a 100'xl00' footprint and tailings will also not exceed a 150'000' 00' fon__ tprinOngoing <br />plaeed at existing darn feature. Pend dirriensien (triangular-) 60'x!GE)'x!2V with a depth of 8' (1:513,0139 <br />(g) I he mine will be accessed via an RISVIIg 9pur Off 01 MOMt LOunty Road 88. T e spur is <br />approximately 105'rn length and in wicith. N o improvemen s to the this spur will be necessary. e <br />spur accesses a previously worked pit. <br />{h} The West Side Placer will use approximateIV 12 acre feet of water per annum. Only one pond will <br />be open at a time. The north pond will be created first _to_cover the north section of mining. Once <br />mining the north-secti&n will,be complete, the north pond's water will he pumped over to create the <br />- / • P / • / / Tt / -s-Zoreoin MEOW,; • - <br />Additional / <br />ugin of we - . <br />Seedmix - ($120 per acre x5) - <br />Till and Seeding (9300 oer acre <br />5,-83910 - <br />600 <br />1500 <br />Previous reclamation costs 7 702.5 <br />Total reclamation estimate: 14,621.72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.