Laserfiche WebLink
Pitch Reclamation Project Colorado Mined Land Reclamation Board — 2016 Annual Reclamation Report <br /> 3.9 General Cleanup Activities <br /> General cleanup activities in the shop area were conducted in 2016, including: <br /> • The high-density polyethylene(HDPE) liner used for fuel containment until 2014 was removed, <br /> and the area was graded and reseeded. No evidence of fuel leakage was observed. <br /> • General housekeeping around the shop building and in the bone yard was conducted. <br /> • Miscellaneous stored items were removed from the sand filter building at the base of the <br /> Sediment Control Pond embankment in preparation for building demolition, which will be <br /> conducted following review by the Engineer of Record due to pipe penetration associated with the <br /> embankment. <br /> The former fuel containment area, following grading and seeding, is shown in Photograph 18. <br /> � I <br /> -17 0�11 <br /> - <br /> ��,.. �, vat' �Y � �w�d�..• ' <br /> Vr <br /> Photograph 18: Former Fuel Containment Area following HDPE Liner Removal, Grading, and <br /> Reseeding <br /> 3.10 New Shed at the Discharge Permit Compliance Monitoring Point <br /> The shed above the CDPS permit compliance point (SW-33) was replaced under Saguache County Land <br /> Use Construction Permit No. 2016120. Photograph 19 shows the new shed. The propane tank shown in <br /> Photograph 20 was installed near the base of the Sediment Control Pond embankment to supply fuel to <br /> heat the new shed. <br /> 15 <br />