0 <br /> "HELD TO A HIGHER STANDARD" <br /> -No fuel or other hazardous material to be present on-site. <br /> -While Mining : Maximum slope of high walls to be 1:1 as stated in the notes on Exhibit F. <br /> Maximum length to be 100 LF <br /> -All equipment and structures will be portable. No permanent structures to be located on <br /> permitted area <br /> -A 200 FT'No-Mining Buffer'to be in place adjacent to all Power Lines <br /> Exhibit E— Reclamation Plan <br /> Duran & Pearce Contractors (Operator) will follow and conform by the reclamation plan <br /> submitted for the existing 110 Permit for the Martin 1-A Permit# M-1990-140 <br /> (a) Duran & Pearce Contractors (Operator) will be using a Phase Mining Method. Under <br /> this method, before new acreage is being opened up for mining and extraction <br /> purposes,the acreage that had previously been mined will be reclaimed. <br /> *No more than the phased 6.2—9.9-acre max disturbance shall need to be reclaimed at <br /> any given time. Each phase, 9.9 acres will be disturbed (active mining, processing areas <br /> and unreleased reclamation) mined and reclaimed. Reclamation will be concurrent with <br /> mining operation and more likely 2-3 acres of reclamation will be done as mining <br /> progresses. Reclamation methods will be by the following: Using loaders, dump trucks <br /> and dozers to move previous stockpiled over burden and spread and re-shape to no less <br /> than a 3:1 slope. Existing ground to is close to a 3:1 grade slope. *Operator to rip all <br /> compacted areas to a depth of 2 ft. prior to soil replacement. Final grading will be <br /> complete prior to re-locating and installing topsoil. Top soil will be spread and installed <br /> in 6-8" ranges. Seeding will be broadcasted and will be followed by a ►ight drag or <br /> harrow. In that Duran & Pearce Contractors(Operator)will be phase mining this <br /> permitted area,there shall not be more than a 2-3 acres open at a single time. <br /> * Location of stockpiles of topsoil and overburden material will be dependent of each <br /> phase. There will not be a 'central location' for topsoil and/or clay overburden. <br /> * NO MULCHING will occur. <br /> * Stockpiled materials will be seeded while stored with the same mix. Present stockpile <br /> material height is from 5' to 10'tall. All topsoil piles to not ne reapplied will be seeded <br /> within 180 days. <br /> 4 <br />