Laserfiche WebLink
April 12, 2017 C-1992-081/Hayden Gulch Loadout JDM <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 4 of 5 <br /> <br />feet in length and 18 inches in diameter (Table 12-2). The culvert should be repaired or replaced as <br />designed. This maintenance item is to be in compliance by the April 30, 2017 date. <br /> West side and east side of culvert RRC-1 Location <br /> <br />ROADS – Rule 4.03 Construction 4.03.1(3)/4.03.2(3) Drainage 4.03.1(4)/4.03.2(4) Surfacing and <br />Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) Reclamation 4.03.1(7)/4.03.2(7): <br /> <br />The tie-across haul road was stable and dry with no problems noted. <br /> <br /> <br />DOCUMENTS RECEIVED - NA <br />OTHER (SPECIFY) - NA <br /> <br />