Laserfiche WebLink
AVCOLORADO <br />Division of Reclamation, <br />Mining and Safety <br />Department of Nat:.ral Resource <br />MINERALS PROGRAM INSPECTION REPORT <br />PHONE: (303) 866-3567 <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />MINE NAME: <br />MINE/PROSPECTING ID#: <br />MINERAL: <br />COUNTY: <br />23 Road Pit <br />M-1979-089 <br />Sand and gravel <br />Mesa <br />INSPECTION TYPE: <br />INSPECTOR(S): <br />INSP. DATE: <br />INSP. TIME: <br />Monitoring <br />Stephanie J. Mitchell <br />March 15, 2017 <br />14:00 <br />OPERATOR: <br />OPERATOR REPRESENTATIVE: <br />TYPE OF OPERATION: <br />Grand Junction Pipe & Supply Co. <br />I Jon Mueller <br />112c - Construction Regular Operation <br />REASON FOR INSPECTION: <br />Normal I&E Program <br />BOND CALCULATION TYPE: <br />Complete Bond <br />BOND AMOUNT: <br />$242,500.00 <br />DATE OF COMPLAINT: <br />POST INSP. CONTACTS: <br />JOINT INSP. AGENCY: <br />NA <br />None <br />None <br />WEATHER: <br />INSPECTOR'S SIGNATURE: <br />SIGNATURE DATE: <br />Clear <br />April 10, 2017 <br />The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Gen. Compliance With Mine Plan <br />PROBLEM/POSSIBLE VIOLATION: Problem: The current mine plan needs to be updated and clarified pursuant to <br />C.R.S. 34-32.5-112 (1)(c)(VI). The operator must provide sufficient information to describe or identify how the <br />operator intends to conduct the operation. <br />CORRECTIVE ACTIONS: The operator shall submit a Technical Revision, with the required $216 revision fee, to <br />update and clarify the current approved mine plan to reflect existing and proposed activities by the corrective <br />action date. <br />CORRECTIVE ACTION DUE DATE: 6/09/17 <br />Pagel of 5 <br />