Laserfiche WebLink
Page 4 of 5 <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />14. Is adequate topsoil reserved lar reclaniatiun, based on your appro\ ed permit'' :Y:QD NO N; A <br />If "NO", please explain: <br />15. Is the reserved topsoil vegettited/stabilized Iii iieeoi'dtlilee with Rule 3. I.9( I )? VZ) NO N/A <br />If "NO" please explain: <br />16. If mining lilts exposed groundwater, is the site In caniplimicc with the approved mining plan and Oflice of the_Statc <br />Fngincer (Well Permit, S.W.S.P., and/or Permancnl Augmentation Plan)'.' YES NO �_& JD <br />17. Are all hazardous materials stored within approved spill containment structures? _ESS NO N/A <br />19, is vour financial warranty value sufficient to cover the cost to complete reclamation" AM NO N/A <br />19. Is vour basis for legal right to enter still valid? NO <br />20. Does your permit require you to submit monitoring uitormatiori annually'! YES N/A <br />if "Yes", please attach the required monitoring results to this Annual Repot•t. <br />21. As required by Colorado Mined Land Reclamation Act and./or Colorado Land Reclamation Act tier the Extraction of <br />Construction Materials ((',R.S. 34-32-110 or 34-3-1.5-110), attach a trap to this report that accurately depicts the permit <br />boundary, current affected area boundary and location ot'the acreages specified in items 7- 12 and 14. UPDATED <br />MAP ATTACHED: <br />Total acres <br />Total acres I <br />Total acres <br />I I Total acres <br />I <br />backfilled: <br />seeded w; <br />10' <br />witopsotl <br />mulched w, <br />_ <br />approved mix:_ <br />— ---' <br />re laced:- <br />-_ <br />- <br />a roved mulch: i <br />-{ <br />Total acres � <br />Total acres <br />� Topsoil <br />Mulch application <br />graded: <br />fertilized w, <br />s.w <br />replacement <br />'a <br />rate (tons, ac): <br />i <br />I <br />tpvd fertilizer <br />depth (m.), <br />i _ <br />Seed <br />Fertilizer <br />Mulch <br />application <br />application I <br />j application <br />method: <br />niethod: _ _�— <br />- - -- <br />- -L method: - - -- - - -- <br />13. Is weed control being conducted <br />_ _ <br />in accordance with an <br />approved Weed Control Plan" YES NO t'v%Rj' <br />if -YES", indicate the weed species, control arca, control type, appliciition <br />rate and treatment date on the report map. <br />14. Is adequate topsoil reserved lar reclaniatiun, based on your appro\ ed permit'' :Y:QD NO N; A <br />If "NO", please explain: <br />15. Is the reserved topsoil vegettited/stabilized Iii iieeoi'dtlilee with Rule 3. I.9( I )? VZ) NO N/A <br />If "NO" please explain: <br />16. If mining lilts exposed groundwater, is the site In caniplimicc with the approved mining plan and Oflice of the_Statc <br />Fngincer (Well Permit, S.W.S.P., and/or Permancnl Augmentation Plan)'.' YES NO �_& JD <br />17. Are all hazardous materials stored within approved spill containment structures? _ESS NO N/A <br />19, is vour financial warranty value sufficient to cover the cost to complete reclamation" AM NO N/A <br />19. Is vour basis for legal right to enter still valid? NO <br />20. Does your permit require you to submit monitoring uitormatiori annually'! YES N/A <br />if "Yes", please attach the required monitoring results to this Annual Repot•t. <br />21. As required by Colorado Mined Land Reclamation Act and./or Colorado Land Reclamation Act tier the Extraction of <br />Construction Materials ((',R.S. 34-32-110 or 34-3-1.5-110), attach a trap to this report that accurately depicts the permit <br />boundary, current affected area boundary and location ot'the acreages specified in items 7- 12 and 14. UPDATED <br />MAP ATTACHED: <br />