My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-04-11_REPORT - M1981044
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1981044
>
2017-04-11_REPORT - M1981044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2017 11:01:24 AM
Creation date
4/12/2017 10:28:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981044
IBM Index Class Name
Report
Doc Date
4/11/2017
Doc Name
Annual Fee/Report/Map
From
Solberg Gravel LLC
To
DRMS
Annual Report Year
2017
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
faze 3 of 5 <br />I_ ----- - ---- --- _ <br />112c Annual Report <br />Permit Number: M-1991-044 -- -- - <br />RECEIVED <br />�Permittee Name: --�Solberg Gravel I.[.(' -�--�-_--- <br />Operation Name: Solberg Pit <br />APR 112017 , County: El Paso <br />--r -_-- <br />Annnersary Datc:--Ap--n-l 7,-- 2- 017 <br />DIVISION OF RECLAMATION �---------- <br />MI Current Bond Amt: 572.635 00 E' -< ;ER <br />annual Fee Due: 5791.00 <br />Permit Acreage: 234.56. - - <br />(DRMS Office Use Only)— �~ <br />DBMS Specialist TC1 <br />According to C.R.S. 34-32.5-116 or 34-32-110. each year, on the anniversary date of the permit. an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required monitoring <br />information, reclamation accomplished to date and during the preceding year, any new disturbance that is anticipated to <br />occur during the upcoming year, any reclamation that will be performed during the upconung year, the dates for the <br />beginning of active operations, and the date active operations ceased fir the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. It, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />I. Is the site identification sign posted in accordance with Rule 3.1.12(1)'.' YES) NO <br />2. Is the affected arca boundary clearly marked in accordance with Rule 3.1.12(2)7 ,yam NO <br />3 is the mine site to final reclamation (all material extraction and stockpile removal is complete)'' YES �4W <br />If "YES," please note time limits related to completion of reclamation. Rule 3.1 3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? 7 <br />5. Docs the mine operate more than 180 days per year.' Y� NO <br />If "NO". please review Rule 1.13 to assure that your mune is in compliance <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? YES d�n <br />b) approval for INTERMITTENT OPERATION? �Y-M NO <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). YOO `� <br />K. Number of acres that were newly affected during the current report year: <br />9. Number of acres that were reclaimed during the current report year: <br />10. Estimated new acreage to be affected in the next report year: <br />1 I . Estimated acres to be reclaimed in the next report year: S" <br />
The URL can be used to link to this page
Your browser does not support the video tag.