Laserfiche WebLink
Repair and Reclamation Cost Estimate TR-69 <br /> Quantity Unit Unit Price Estimate <br /> Mobilization & Demobilization 1 LS $ 10,000 $ 10,000 <br /> Topsoil Salvage 325 CY <br /> Supervisor 8 HRS $ 45 $ 360 <br /> Front End Loader 41 HRS $ 75 $ 300 <br /> Motor Grader 4 HRS $ 75 $ 300 <br /> Excavation 1100 CY <br /> Supervisor 16 HRS $ 45 $ 720 <br /> Backhoe200JD 16 HRS $ 115 $ 1,840 <br /> Front End Loader 16 HRS $ 75 $ 1,200 <br /> Water Truck 6 HRS $ 65 $ 390 <br /> Place and Compact Backfill 1100 CY <br /> Supervisor 32 HRS $ 45 $ 1,440 <br /> Backhoe 200JD 321 HRS $ 115 $ 3,680 <br /> Front End Loader 32 HRS $ 75 $ 2,400 <br /> Water Truck 16 HRS $ 65 $ 1,040 <br /> Compactor 32 HRS $ 120 $ 3,840 <br /> Replace Topsoil 325 CY <br /> Supervisor 8 HRS $ 45 $ 360 <br /> Front End Loader 4 HRS $ 75 $ 300 <br /> Motor Grader 4 HRS $ 75 $ 300 <br /> Materials <br /> Concrete Slab over shaft 15 CY $ 400 $ 6,000 <br /> Seed and Mulch <br /> Seed 0.4 AC $ 325 $ 130 <br /> Drill Seed 0.4 AC $ 500 $ 200 <br /> Hydro Mulch 0.4 AC $ 1,500 $ 600 <br /> Total Estimated Cost $ 34,470 <br /> 12/16 <br />