My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-30_INSPECTION - M1973007SG
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1973007
>
2017-03-30_INSPECTION - M1973007SG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2020 6:15:36 AM
Creation date
3/31/2017 8:03:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973007SG
IBM Index Class Name
Inspection
Doc Date
3/30/2017
Doc Name
Corrective Action Documentation
From
Transmit Mix Concrete Co.
To
DRMS
Inspection Date
12/12/2016
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
eme <br /> Continental Materials Corporation <br /> Transit Mix Concrete Co. <br /> 440 S. LaSalle St. Suite 3100 <br /> Chicago IL 60605 <br /> regarding weather a full geotechnical investigation was needed given the short <br /> remaining life of the exiting wash fines pond and the amount of fill to be placed on the <br /> southwest embankment, TMCC chose to go with your option A, "Install of the requested <br /> piezometer and if it can be shown the piezometric surface would not contribute to a <br /> potential failure, no geotechnical analysis would be required, or. <br /> The piezometer hole was drilled on the outside edge of the road running on top of the <br /> southwest embankment before the 3H:1V slope starts and runs downward toward <br /> Bradley Road. The hole was drilled to a depth of 36 feet, with ground water being <br /> encountered at 35.6 feet. The hole was placed in fill to a depth of 20 feet, where original <br /> ground surface was encountered. A drill log was completed by Vine Laboratories and is <br /> included as Appendix A of this response letter. Picture 4 through 6, show the location of <br /> the piezometer hole location and completed capped well. <br /> - - ' <br /> Picture 4: Drill rig on location of piezometer, southwest embankment of existing wash <br /> fines pond. <br />
The URL can be used to link to this page
Your browser does not support the video tag.