My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-30_INSPECTION - M1973007SG
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1973007
>
2017-03-30_INSPECTION - M1973007SG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2020 6:15:36 AM
Creation date
3/31/2017 8:03:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1973007SG
IBM Index Class Name
Inspection
Doc Date
3/30/2017
Doc Name
Corrective Action Documentation
From
Transmit Mix Concrete Co.
To
DRMS
Inspection Date
12/12/2016
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CMC <br /> Continental Materials Corporation <br /> Transit Mix Concrete Co. 440 S. LaSalle St. Suite 3100 <br /> Chicago IL 60605 <br /> r <br /> W4- -- <br /> 1 <br /> Picture 3: Northwest end of new sloping, approximately 2.6H:1V <br /> The slope has not been seeded yet as the ground is pretty dry and the temperatures <br /> and moisture levels have not been in a range to foster good growing conditions. As the <br /> year progresses into April TMCC will, with taking the forecast into consideration, <br /> prepare the slope to accept seed. <br /> CORRECTIVE ACTION #2: <br /> INSPECTION TOPIC: Backfilling & Grading <br /> PROBLEM/POSSIBLE VIOLATION #4: Problem: Observed portions of over steepened <br /> slope on the southwest embankment outer face of the current wash pond potentially <br /> reducing the geotechnical stability of the embankment. <br /> CORRECTIVE ACTIONS: Prior to the Corrective Action due date, the Operator must <br /> conduct a geotechnical investigation for the purpose of assessing the slope stability of <br /> this embankment. EXTENDED CORRECTIVE ACTION DUE DATE: 4/11/2017 <br /> RESPONSE: <br /> On March 8, 2017 Vine Labratories, Inc. under the supervision of Brierley Associates <br /> started and completed the piezometer hole that was requested in your response to a <br /> clarification email from TMCC dated February 1, 2017. In response to our question <br />
The URL can be used to link to this page
Your browser does not support the video tag.