Laserfiche WebLink
CMC <br /> Continental Materials Corporation <br /> Transit Mix Concrete Co. 440 S. LaSalle St. Suite 3100 <br /> Chicago IL 60605 <br /> r <br /> W4- -- <br /> 1 <br /> Picture 3: Northwest end of new sloping, approximately 2.6H:1V <br /> The slope has not been seeded yet as the ground is pretty dry and the temperatures <br /> and moisture levels have not been in a range to foster good growing conditions. As the <br /> year progresses into April TMCC will, with taking the forecast into consideration, <br /> prepare the slope to accept seed. <br /> CORRECTIVE ACTION #2: <br /> INSPECTION TOPIC: Backfilling & Grading <br /> PROBLEM/POSSIBLE VIOLATION #4: Problem: Observed portions of over steepened <br /> slope on the southwest embankment outer face of the current wash pond potentially <br /> reducing the geotechnical stability of the embankment. <br /> CORRECTIVE ACTIONS: Prior to the Corrective Action due date, the Operator must <br /> conduct a geotechnical investigation for the purpose of assessing the slope stability of <br /> this embankment. EXTENDED CORRECTIVE ACTION DUE DATE: 4/11/2017 <br /> RESPONSE: <br /> On March 8, 2017 Vine Labratories, Inc. under the supervision of Brierley Associates <br /> started and completed the piezometer hole that was requested in your response to a <br /> clarification email from TMCC dated February 1, 2017. In response to our question <br />