Laserfiche WebLink
Bond Estimate <br /> Wildcat Mining Corporation <br /> M-1981-185 <br /> Table 1-1(continued) <br /> May Day Idaho Mine Complex <br /> Bonding Cost Summary (e) <br /> Estimated Reclamation Costs <br /> Wildcat Mining Company <br /> Hesperus,Colorado <br /> Task No Task Description Unit Rate #of Units Task Hours Costs <br /> 4 LAMB MINE ROCK SITE RECLAMATION <br /> Direct Costs <br /> Top Soil/Growth Media(Not $$$/hour $0 0.0 $0 <br /> required) <br /> Regrade Disturbed Lamb Rock $$$/hour $110 16.0 $0 $1,760 <br /> Disposal Area <br /> Tilling/Acre $$$/Acre $90 1.0 $0 $90 <br /> Seed Mix $$$/Acre $150 1.0 $0 $150 <br /> Revegetate $$$/Acre $200 1.0 $0 $200 <br /> BMPs including installation $$$/Acre $1,500 1.0 $0 $1,500 <br /> Amendments $$$/Acre Not Required 0.0 $0 $0 <br /> Weed Control $$$/Acre $150 1.0 $0 $150 <br /> Rip Compacted Area $$$/hour $150 1.0 $0 $150 <br /> Mob/Demob Lump Sum $2,000 1.0 $0 2 000 <br /> Mine Area Sub Total Direct $6,000 <br /> Total Direct$$$ $6,000 <br /> Indirect Costs <br /> Liability Insurance 2.02 %of Direct 0.0 0 $121 <br /> Performance Bond 1.05 %of Direct 0.0 0 $63 <br /> Superintendent $$$/hour $80 16.0 0 $1,600 <br /> Profit 10 %of Direct 0.0 0 600 <br /> Total Operating&Profit $2,384 <br /> Total Lamb Reclamation Costs $8,384 <br /> Table L-1-final 10.22.2016 <br />