My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-27_REVISION - M1981185 (29)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2017-03-27_REVISION - M1981185 (29)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:16:33 PM
Creation date
3/30/2017 8:02:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
Revision
Doc Date
3/27/2017
Doc Name Note
May Day Idaho Mine Complex Amendment
Doc Name
2 of 10
From
Sunrise Mining, LLC
To
DRMS
Type & Sequence
AM2
Email Name
LJW
GRM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit D-Mine Plan Amendment <br /> 6.4.4(b) Earthmoving <br /> Based on the proposed Mine Plan,the following earthmoving activities will be <br /> undertaken at the site(in proposed order of operation): <br /> • road and bench stormwater structures grading, installation and maintenance ; <br /> • road cut and fill maintenance; and <br /> • May Day No. 1, 2 and Idaho bench mine rock storage, and ore transfer; <br /> 6.4.3(c) Water diversions and impoundments <br /> No diversions or impoundments will be constructed. <br /> 6.4.4(d) The size of area(s)to be worked at any one time <br /> As described above,most of the operational activity will occur in underground workings. <br /> Surface disturbances will be limited to the operational areas depicted on Figure D-1. <br /> These individual disturbed areas are anticipated to be limited to less than 50 acres at any <br /> one time, and are anticipated to be located in the affected mine areas during the life of the <br /> mine. <br /> 6.4.4(e) An approximate timetable to describe the mining operation <br /> The mine plan has been outlined in the approximate order of operation. The approximate <br /> timeline based on a 10 year mine life. <br /> Phase Operation Mine Year <br /> 1 2 3 4 5 6 7 8 9 10 <br /> 1 Construction& <br /> Reclamation Activities <br /> 2 May Day No. 1 <br /> Exploration and Production <br /> 3 May Day Mine Production <br /> Expansion <br /> 4 Mine Completion and <br /> Closure <br /> The size and location of each area to be worked in each phase is described above in the <br /> detailed phase discussions. <br /> 6.4.4(f) Description of Ore Body and Underlying Stratum <br /> Three types of mineralization are distinguished in the permit area: <br /> • highly disseminated epithermal gold-silver-telluride narrow veins (typically less <br /> than five(5) feet wide); <br /> 112(d)Permit <br /> May Day and Idaho Mine and Mill Application <br /> M-1981-185 <br /> Revised-03.08.2017 <br /> Exhibit D—Rule 6.4.4 Page 6 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.