My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-03-28_HYDROLOGY - M1983194
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1983194
>
2017-03-28_HYDROLOGY - M1983194
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2020 3:42:37 AM
Creation date
3/29/2017 11:46:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983194
IBM Index Class Name
Hydrology
Doc Date
3/28/2017
Doc Name
Sundry Notice for 16H-I and 16H-R Well Design Modifications
From
Daub & Associates
To
DRMS
Email Name
THM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
600 <br /> 16H-1 Injection Well Drilling and Completion Information <br /> 700 <br /> 0.0'-132.8' MD KB; 0.0'-120.0'MD GL: drill 24.0" conductor hole <br /> 0.0'-132.8' MD KB; 0.0'-120.0' MD GL: install 13.375" OD x 12.715" ID conductor casing (J-55, 48.0 lb/ft), cement to surface 800 <br /> East 132.8'-1318.9' MD KB; 120.0'-1306.1' MD GL: directional drill 9.50" vertical intermediate hole to KOP West <br /> 1318.9'-2186.8' MD KB; 1306.1'-2174.0' MD GL: directional drill 9.50" curve portion intermediate hole, average 10.40 per 100 ft Measured <br /> 900 Depth GL <br /> 0.0'-2186.8' MD KB; 0.0'-2174.0' MD GL: install 7.0" OD x 6.366"ID intermediate casing (J-55, 23.0 lb/ft), Centek centralizers every 80-100 ft <br /> 0.0'-2186.8' MD KB; 0.0'-2174.0' MD GL: cement intermediate casing, Portland Type 1/II <br /> l000 <br /> 2186.8'-5375.9' MD KB; 2174.0'-5363.1' MD GL: approximate length; directional drill 6.125" horizontal hole, maintain drill path 3' below top of LBB <br /> KB:6682.4',est <br /> Production Casing (using packer) GL:6669.6',graded <br /> 0.0'-1948.1' MD KB; 0.0'-1935.3' MD GL: install 4.5" x 4.0" ID production casing (J-55, 11.4 lb/ft); install annular packer at 1935.3 MD GL(DS) 1100 <br /> 1948.1'-5375.9' MD KB; 1935.3'-5363.1'MD GL: install 4.5"x 4.0" ID FJ production casing (J-55, 11.4 lb/ft)to TD <br /> Production Casing (using hanger) 1200 <br /> Kick-Off Point <br /> 1948.1'-5375.9' MD KB; 1935.3'-5363.1' MD GL: install 4.5" x 4.0" ID FJ production casing (J-55, 11.4 lb/ft); install hanger at 1935.3 ND GL(DS) 4 1318.9 MD KB <br /> 1306.1 MD GL <br /> 1300 <br /> Intermediate Hole Drill Path <br /> 9.50"dia., 10.4°/100'Build Rate <br /> 132.8-2186.8 MD KB 1400 <br /> Production Casing(using packer) 120 GL <br /> TO in Mid d t to o Lower <br /> LBB <br /> 4.5"OD x 4.0" ID,J-55 <br /> 0.0-1948.1 MD KB <br /> 0.0-1935.3 MD GL 1500 <br /> 7.0"x 4.5"Annular Packer <br /> 4.5"OD x 4.0" ID,J-55, FJ Steel Production Hole Drill Path or 7.0"x 4.5" Heavy Duty Casing Hanger <br /> 1948.1-5375.9 MD KB 6.125"dia. Directional Hole -1948.1 MD KB <br /> 1935.3-5363.1 MD GL 2186.8-5375.9 MD KB Intermediate Casing -1935.3 MD GL <br /> 2174.0-5363.1 MD GL 7.0"OD x 6.366" ID;J-55, 23.0 lb/ft Install at DS �600 <br /> Production Casing (using hanger) 6.241"Drfit;7.875"Coupling OD <br /> 4.5"OD x 4.0" ID,J-55, FJ Steel Projected 16H-R Pass-by 0-2186.8 MD KB <br /> 1948.1-5375.9 MD KB,approx. 2405.8 MD KB 0-2174.0 MD GL � <br /> TD: 5375.9 MD KB,approx. 1935.3-5363.1 MD GL,approx. 2393.0 MD GL <br /> TD: 5363.1 MD GL,approx. <br /> Top of OSMB <br /> $ �.w }+ <br /> W W W W N N v O O A C O ���+.i�J1=D <br /> O coCD <br /> O O O O O O O O CD O O O O O O O CD <br /> O O O O O O O O O <br /> O C. O <br /> HAR 2 8 2017 <br /> W OF RECLAMATION <br /> �tfNIN6�.SAF�-Tv <br /> Natural Soda LLC <br /> 161-1-1 Well Prognosis Schematic <br /> Section 34,T1S, R98W Rio Blanco County, CO <br /> Daub&Associates,Inc.,�,7^� <br /> ��_ - Date: March 23,2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.