Laserfiche WebLink
soo <br /> 00 <br /> 161-1-1 Injection Well Drilling and Completion Information - 6000 <br /> 700 <br /> 1700 <br /> 0.0'-132.8' MD KB; 0.0'-120.0' MD GL: drill 24.0"conductor hole <br /> 5900 <br /> 0.0'-132.8' MD KB; 0.0'-120.0' MD GL: install 13.375" OD x 12.715" ID conductor casing (J-55, 48.0 lb/ft), cement to surface soo soo <br /> East 132.8'-1318.9' MD KB; 120.0'-1306.1' MD GL: directional drill 9.50" vertical intermediate hole to KOP West x <br /> 1318.9'-2186.8' MD KB; 1306.1'-2174.0' MD GL: directional drill 9.50" curve portion intermediate hole, average 10.4° per 100 ft goo ssoo <br /> 900 <br /> 0.0'-2186.8' MD KB; 0.0'-2174.0' MD GL: install 7.0" OD x 6.366" ID intermediate casing (J-55, 23.0 lb/ft), Centek centralizers every 80-100 ft <br /> 0.0'-2186.8' MD KB; 0.0'-2174.0' MD GL: cement intermediate casing, Portland Type I/II 5700 <br /> 1 <br /> 1000 000 <br /> 2186.8'-5375.9' MD KB; 2174.0'-5363.1' MD GL: approximate length; directional drill 6.125" horizontal hole, maintain drill path 3' below top of LBB <br /> KB:6682.4', est <br /> Production Casing (using packer) GL: 6669.6',graded 5600 <br /> 1100 11oo <br /> 0.0-1948.1' MD KB; 0.0-1935.3 MD GL: install 4.5�. x 4.0., ID production casing (J-55, 11.4 lb/ft); install annular packer at 1935.3 MD GL (DS) <br /> 1948.1'-5375.9' MD KB; 1935.3'-5363.1' MD GL: install 4.5" x 4.0" ID FJ production casing (J-55, 11.4 lb/ft) to TD <br /> 5500 <br /> Production Casing (using hanger) 1200 T <br /> 1200 <br /> Kick-Off Point <br /> 1948.1'-5375.9' MD KB; 1935.3'-5363.1' MD GL: install 4.5" x 4.0" ID FJ production casing (J-55, 11.4 lb/ft); install hanger at 1935.3 MD GL (DS) 1318.9 MD KB <br /> 1306.1 MD GL 5aoo <br /> 1300 1300A-Groove <br /> Intermediate Hole Drill Path 5300 <br /> 9.50"dia., 10.4°/100'Build Rate 1400 JE 1400 <br /> 132.8-2186.8 MD KB R-7 <br /> Production Casing(using packer) 120.0-2174.0 KID GL <br /> 4.5"OD x 4.0" ID,J-55 TD in Mid to Lower LBB Measured <br /> Gd 1500 <br /> szoo <br /> 0.0-1948.1 MD KB 1500 B-Groove <br /> 0.0-1935.3 MD GL 7.0"x 4.5"Annular Packer <br /> 4.5"OD x 4.0" ID, J-55, FJ Steel Production Hole Drill Path or 7.0"x 4.5" Heavy Duty Casing Hanger \600 <br /> 1948.1-5375.9 MD KB 6.125"dia. Directional Hole -1948.1 MD KB 5100 <br /> 1935.3-5363.1 MD GL 2186.8-5375.9 MD KB Intermediate Casing -1935.3 MD GL �s 00 R-6 <br /> 7.0"OD x 6.366" ID; J-55,23.0 lb/ft <br /> 2174.0-5363.1 MD GL Install at DS 7� <br /> Production Casing(using hanger) 6.241" Drfit;7.875"Coupling OD o0 <br /> 0-2186.8 MD KB �� 5000 <br /> 4.5"OD x 4.0" ID,J-55, FJ Steel Projected 16H-R Pass-by 00 <br /> 1948.1-5375.9 MD KB, approx. 2405.8 MD KB 0-2174.0 MD GL ��00 <br /> TD: 5375.9 MD KB, approx. 1935.3 5363.1 MD GL, approx. 2393.0 MD GL �� '�0 Measured <br /> TD: 5363.1 MD GL, approx. 00 0 Depth KB L-s 4900 <br /> �- N_ O DS/L-SE <br /> O LS B/C <br /> W W V,, W W O cN0 OD V O USB <br /> O O O O <br /> o OD " o 0 0 0 o O o o S S o O o N Lee <br /> Oc 0 0 c O o 0 o O <br /> 1}}} IIIIIIIIIIIIIIIIII II IIIIIIIIIIIIIIIII II IIIIIIIIII IIIIIIII IIIIIIIIIII III j 4800 <br /> T��TITT1'" �y� �'1 �IIIIIItIIII IIIIt I11111IIII1111111111Itt IIIIIIIIt IIIIIIIIIIIIIIIIIIIIIII N N N <br /> N <br /> OA W <br /> co O O <br /> A C, CID O Cl <br /> 0) Ln N O O O O� O O O <br /> O O O O CD <br /> ECE.��d <br /> 00 O O O <br /> OSMB Upper Boies Bed 4700 <br /> Proposed Drill Path Lower Boies Bed <br /> 3' Below Top of LBB <br /> p VVON OF w a <br /> MINING&5hi 4600 <br /> Natural Soda LLC <br /> 16H-1 Well Prognosis <br /> Section 34, T1S, R98W Rio Blanco County, CO <br /> Daub&Associates,Inc. -'EI F ^ T <br /> _ Date: March 23,2017 <br />