Laserfiche WebLink
March 21, 2017 C-1981-018/Deserado Mine JDM <br />Pond RP -5a contained water with no discharge noted. The combination primary/emergency spillway found to be <br />in compliance with no problems noted. The embankments were well vegetated and stable. <br />Pond RR -1 was dry at the time of the inspection. Embankments were stable with no problems noted. Primary <br />riser and emergency spillway found to be in compliance. <br />Pond SS -1 contained water, with no discharge at the time of the inspection. Embankments appeared stable and <br />well vegetated with no signs of damage. <br />Pond SS -2 was dry at the time of the inspection. No problems were noted. Embankments appeared stable with <br />DP -1 Pond <br />PP -2 Pond RP -1 Pond <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 3 of 8 <br />